Shovel Ready 1 Limited

9 unique locations (108 components)

Active MW: 128.12 MW
Inactive MW: 141.43 MW
25 Southfield Lingard Lane Stockport SK6 2QN (16 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• Aggregate CMU from multiple sources
• N/A
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Applied Automation Eastern Wood Road Langage Industrial Estate PL7 5ET (10 components)
• Gas engine
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Bankside Industrial Estate, Middlefield, Glensburgh, Falkirk, FK2 7XU (2 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• A new build gas fuelled generating station.
Inactive • 2022-23 (T-4), 2020-21 (T-4)
EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU (34 components)
• Torness Power Station CMU 1: [TN1-23] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 1: [TN1-24] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 2: [TN2-24] T_TORN-2 + (50% x T_TORN-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Grimethorpe CMM Generation Plant, Springvale Road, Grimethorpe S72 7BF (6 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land at Jarrow Slake Port of Tyne Adjacent to Jarrow Road SOUTH SHIELDS NE34 9PS (4 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• DSR Component providing load turn down at a retail store
• Furnaces
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW (6 components)
• A new build 29MW battery energy storage system
• A new build 30MW battery energy storage system
• CMU consisting of multiple reciprocating engines and alternators
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Rassau Industrial Estate, Ebbw Vale, South Wales, NP23 5SD (26 components)
• 16MW Power plant comprising 8x2MW gas reciprocating engines.The Power plant is connected to the local distribution and gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
• 16MW Power plant comprising reciprocating engines.The Power plant is connected to the local distribution and gas network.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (4 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
• Onsite load reduction and back up generation behind the meter on multiple sites
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 9 locations