THE ISLE OF WIGHT ENERGY COMPANY LIMITED

7 unique locations (42 components)

Arreton Valley Nursery, Hale common, Arreton, Isle of Wight, PO30 3AR (9 components)

Industrial flexible demand used for manufacturing processes and remotely controlled via SCADA.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (21 components)
• The CMU MAIN16 consists of three identical components (JENBA1,2 &3), with each CHP engine delivering 1.845MW (1.942MW design output but derated at 95% due to their age). The total CMU generation capacity is declared 5.535MW and additional PSEUDO MPAN's are fitted.
• The CMU component JENBA1 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Scotia Road Business Park, Tunstall, Stoke on Trent, ST6 4HG (1 component)

The CMU component will have a connection capacity of 2.5MW. BYD Battery

Active • 2026-27 (T-4)
0.30 MW
Tees Valley Nursery, The Moat, Billingham, TS23 4ED (3 components)

Industrial load that is independently metered and controllable via SCADA. Load can be operated for 8+ hours. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.57 MW
Wight Salads Arreton Newport Isle of Wight PO30 3AR (6 components)

The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be the technology used

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Wright Street, Paisley, Renfrew, PA4 8AN (1 component)

Battery Energy Storage, 49.990 MW installed for a 2hr system.

Active • 2028-29 (T-4)
10.47 MW