UNIPER GLOBAL COMMODITIES SE

8 unique locations (231 components)

Active MW: 8505.13 MW
Inactive MW: 12482.30 MW
1, THE OLD BARN PURLIEUS, MINETY, MALMESBURY SN16 9RP (Nearest postcode to grid reference: SN16 9DX). (19 components)
• Battery Storage Plant
• Load reduction on site supported by non-exporting standby generation.
• Reciprocating genset in acoustic enclosure
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Inverawe Power Station, Inverawe, by Taynuilt, Argyll, PA35 1HU (24 components)
• 1 x hydro turbine & synchronous generator
• 1x hydro turbine & synchronous generator
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (13 components)
• 19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP
• Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• EnerG 1000 CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (10 components)
• 7 MW of Battery Storage loacated at Grantham.
• 7 MW of Battery Storage located at Grantham.
• Battery Storage located at Grantham.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
Pembroke Power Station Pembroke Dyfed SA71 5SS (55 components)
• Pembroke 21 - CCGT MSID: 7237
• Pembroke 41 - CCGT MSID: 7237
• Pembroke 51 - CCGT MSID: 7237
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Power Station Road Isle of Grain Rochester ME3 0AR (69 components)
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Sellindge Convertor Station, Church Lane, Sellindge, Ashford, TN25 6AF (21 components)
• Interconnexion France Angleterre (IFA) 2,000MW high voltage direct current link between the French and GB transmission systems.
• Interconnexion France Angleterre (IFA) 1988MW (TEC) high voltage direct current link between the French and GB transmission systems.
• Newbuild gas generator
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (20 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021