Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

UNIPER GLOBAL COMMODITIES SE

5 unique locations (35 components)

Active MW: 5016.59 MW
Inactive MW: 15970.84 MW
Asda Boston, Unit 2 Welland Business Park, Clay Lake, Spalding PE12 6BL (5 components)
• A gas fuelled generating station.
• Grain B CCGT Unit 7 CHP element is via supply of heat to Grain LNG regasification facility
• Load reduction on site supported by non-exporting standby generation.
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset. TA3 6RX (6 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Chickerell Generation Site, Off Radipole Lane, Chickerell, Weymouth, DT4 9RW (8 components)
• 1 x OCGT
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Load reduction on site supported by non-exporting standby generation.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Chippenham Station, Cocklebury Lane, Chippenham, SN15 1RS (11 components)
• 4 x reciprocating engines
• A 20MW New Build Battery Storage site
• CHP Unit
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No.1 Maxwell Road Woodston Industrial Estate Peterborough PE2 7JB (5 components)
• A power plant, with associated civil works, switchgear and electrical connection.
• A recently completed power plant, with associated civil works, switchgear and electrical connection.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Loading map...
Showing 5 locations