UNIPER GLOBAL COMMODITIES SE

16 unique locations (521 components)

Active MW: 8505.13 MW
Inactive MW: 12482.30 MW
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (90 components)
• E1000 CHP
• Existing CCGT
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (35 components)
• A 7.5MW Tesla Battery Energy Storage System
• Killingholme Module 1 converted to open cycle operation
• Killingholme Module 2 converted to open cycle operation
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Chickerell Generation Site, Off Radipole Lane, Chickerell, Weymouth, DT3 4PA (17 components)
• 1 x OCGT
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Gas fuelled generation plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Chippenham Station, Cocklebury Lane, Chippenham, SN15 1RS (11 components)
• 4 x reciprocating engines
• A 20MW New Build Battery Storage site
• CHP Unit
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Component has yet to be procurred (226 components)
• Component has yet to be procurred
• District heating implementation with one asset 1MW and no auxiliary load
• Poole Existing Site CHP
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Dafen Power, Llethri Road, Dafen Park Industrial Estate, Llanelli, SA14 8QN (9 components)
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and an expected export of 36MW. Located in the Chittering Industrial Estate in Avonmouth.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Heathfield Landfill, John Acres Lane, Kingsteignton, Devon, TQ12 3GP (3 components)
• DSR Component providing load turn down at a data centre
• OCGT from Grain U4. Fuel is Gas Oil as specified in BS 2869 Class A2
• The CMU at the Heathfield Landfill site in Devon will be made up of three reciprocating engines generating from natural gas. In their current state, these engines have been designed to generate from landfill gas, but will be converted to natural gas and then recommissioned, ahead of the delivery year. The three components of the CMU (referenced VIR074, VIR079 and VIR080) are Cummins QSV91 units, built in 2008 and rated at 1,750kW. Each engine generates at 415V, which is then stepped up to 11kV and then to 33kV for export.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land off Amy Johnson Way, Blackpool, FY4 2RS (14 components)
• A gas fuelled generating station.
• Connah's Quay PS Unit 1 CCGT
• Containerized high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear
Active • 2028-29 (T-4), 2023-24 (T-4) ...
Land on the east side of Cowpen Bewley Road, Billingham,  TS23 4ED (26 components)
• Gas peaking reciprocating engine
• On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
• Reciprocating genset
Active • 2028-29 (T-4), 2027-28 (T-4) ...
LAND ON THE NORTH SIDE OF DESFORD ROAD, ENDERBY, LEICESTER, LE19 3LR (18 components)
• Battery Storage Plant
• Small gas fired OCGT.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Land to the east side of Brunel Road, Manor Trading Estate, Benfleet, Essex, SS7 4PS (14 components)
• 14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• District heating implementation of two gas CHP engines with no auxilliary load
• OCGT from Grain U1. Fuel is Gas Oil as specified in BS 2869 Class A2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Langstone Power Generation Plant, Southmoor Lane, Havant, Hampshire, PO9 1JW (10 components)
• Grain B CCGT Unit 6 CHP element is via supply of heat to Grain LNG regasification facility
• Municipal waste incineration plant located in Chineham Hampshire. It is based on one boiler supplying steam to a turbine-generator.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Lochawe, Dalmally, Argyll, PA33 1AN, Scotland (25 components)
• Refurbishment Unit 4 Cruachan pump storage hydro plant
• Unit 1 Cruachan pumped storage hydro plant
• Unit 2 Cruachan pumped storage hydro plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Lymedale Business Park, Holditch Road, Newcastle-under-Lyme, ST5 9JA (8 components)
• Medway CCGT
• The CMU Component is made of brand new gas-fired engines.
• The CMU Component is made up of gas-fired engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Tring Road, Tring, HP23 4RA (6 components)
• 20 x 1mw gas generator units to be installed on designated land at Tring Road - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• A gas fuelled generating station.
• Connah's Quay PS Unit 4 CCGT
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
WTI UK Ltd Parc Adfer, Weighbridge road, Deeside Industrial Estate zone 4, Flintshire, CH5 2LL (9 components)
• An energy from waste facility located in North Wales and designed to generate electricity
• Enfield CCGT Power Station - (one unit station)
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 16 locations