Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

URBAN RESERVE STORAGE LIMITED

4 unique locations (95 components)

Active MW: 55.71 MW
Inactive MW: 418.79 MW
Land at Unity Farm, Brampton CA8 1QZ (2 components)

CMU component consisting of multiple battery cells for electricity storage @11kV and the supply of electricity to the 11kV network

Active • 2028-29 (T-4)
BB8 (30 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
• EV charging at residential premises
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
2.58 MW
BB12 (61 components)
• 15.000MW of Battery Energy Storage Systems
• EV charging at residential premises
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Active • 2027-28 (T-4), 2025-26 (T-1) ...
3.88 MW
Aspen Gardens Stotfold Hitchin Bedfordshire SG5 (2 components)
• Auxiliary load subtracted prior to the metering point.
• CMU component consisting of multiple battery cells for electricity storage @11kV and the supply of electricity to the 11kV network
Active • 2028-29 (T-4), 2018-19 (T-4)
0.78 MW
Loading map...
Showing 4 locations