Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

UNIPER GLOBAL COMMODITIES SE

13 unique locations (98 components)

Active MW: 8505.13 MW
Inactive MW: 12482.30 MW
WTI UK Ltd Parc Adfer, Weighbridge road, Deeside Industrial Estate zone 4, Flintshire, CH5 2LL (9 components)

An energy from waste facility located in North Wales and designed to generate electricity

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Tring Road, Tring, HP23 4RA (11 components)
• 10 x 1mw gas generator units to be installed on designated land at Tring Road - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• 19 x 1mw gas generator units to be installed on designated land at Tring Road - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• 20 x 1mw gas generator units to be installed on designated land at Tring Road - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• ... and 1 more unique description
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Solway Trading Estate Maryport Cumbria CA15 8NF (7 components)

New build power station comprised of multiple reciprocating engines.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
LAND ON BREDBURY WAY STOCKPORT SK6 2TF (6 components)

CMU consisting of multiple gas reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Lancaster University, Bailrigg, Lancaster, LA1 4YW (12 components)

Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ. (5 components)

EP Humber Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Challenge Way, Blackburn, Lancashire BB1 5QB (4 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Barrow Man Road Birchington Kent CT7 0AX (12 components)
• Two CHP engines in horticultural environment with no auxilliary load
• Two 2.7MW CHP engines. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Tamworth, 91 Chesterfield Rd, Lichfield WS13 6QW (3 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (10 components)
• The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 MW. (2)
• N/A
Active • 2024-25 (T-4), 2023-24 (T-4) ...
111 Brancroft Way Enfield Middlesex EN3 7PL (7 components)

Enfield CCGT Power Station - (one unit station) (3)

Active • 2027-28 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 13 locations