VPI POWER LIMITED

12 unique locations (203 components)

Active MW: 11703.54 MW
Inactive MW: 32695.90 MW
New Galloway, Castle Douglas, Kirkcudbrightshire, DG7 3SF, Scotland (43 components)
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Glenlee hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Mythe Road. Tewkesbury. Gloucester. GL20 6AA (18 components)
• Load reduction on site supported by non-exporting standby generation.
• The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 MW.
• West Burton A Power Station Combined CMU WAC-21 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-3 = 100% (T_WBUPS-3) + 25% (E_WBUPS-STX)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Llay Grid Capacity Site Llay Hall Farm Llay Wrexham LL12 0TH (2 components)

3MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land to the east side of Brunel Road, Manor Trading Estate, Benfleet, Essex, SS7 4PS (14 components)
• 14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• District heating implementation of two gas CHP engines with no auxilliary load
• OCGT from Grain U1. Fuel is Gas Oil as specified in BS 2869 Class A2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land south of Holyhead Road, Ketley, Telford, TF1 5HS (2 components)
• 20 x 2MW gas fuelled generators installed on a compound on land south of Holyhead Road, Ketley
• Existing CCGT
Inactive • 2023-24 (T-4), 2022-23 (T-3)
LAND AT L C P AUTOSURE BRIDGE ROAD ASHFORD TN23 1BB (7 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (12 components)
• Combined Cycle Gas Turbine plant
• Energy Centre comprising of lean burn acoustically treated natural gas reciprocating engines
• New build Combined Cycle Gas Turbine plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Kingsnorth, Hoo, Rochester, Kent, ME3 9TX (9 components)
• A new Combined Cycle Gas Turbine unit (unit 4) at Damhead Creek 2 power plant
• A new combined cycle gas turbine (unit 5) at Damhead Creek 2 power plant
• Combined Cycle Gas Turbine plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Foyers Power Station, Foyers, Inverness, IV2 6YB (16 components)
• Gas fuelled generators installed on a compound to the south of Anchor Lane
• Generating Unit 1
• Generating Unit 2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
EDF Energy, Dungeness B power station, Romney Marsh, Kent, TN29 9PX (41 components)
• Dungeness B Power Station CMU 21: [DN2124] T_DNGB21 + (50% x T_DNGB-D)
• Dungeness B Power Station CMU 22: [DN2223] T_DNGB22 + (50% x T_DNGB-D)
• Dungeness B Power Station CMU 22: [DN2224] T_DNGB22 + (50% x T_DNGB-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (35 components)
• EV charging at residential premises
• Operational Reciprocating Engine
• Operational gas reciprocating engine.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1 Ratty's Lane, Hoddesdon, Hertfordshire, EN11 0RF (4 components)
• Combined Cycle Gas Turbine
• Combined Cycle Gas Turbine plant
• Gas fired reciprocating engine(s)
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Loading map...
Showing 12 locations