Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

VEOLIA UK LIMITED

267 unique locations (20262 components) - Page 1 of 11

Active MW: 110.49 MW
Inactive MW: 1030.72 MW
AB25 (6 components)
• Domestic EV charger
• EV charging at residential premises
• Two CHP engines in horticultural environment with no auxilliary load
Active • 2025-26 (T-1), 2025-26 (T-4) ...
AL1 (92 components)
• EV charging at residential premises (2)
• EV charging on residential premises
Active • 2027-28 (T-4), 2025-26 (T-1) ...
3.07 MW
B43 (34 components)
• A gas engine CHP site providing hot water to a local district heating network
• Domestic EV charger
• EV charging at residential premises
Active • 2025-26 (T-1), 2025-26 (T-4) ...
B63 (53 components)
• Bus depot site
• Domestic demand turn down
• EV charging at residential premises
Active • 2025-26 (T-1), 2025-26 (T-4) ...
B75 (100 components)
• Domestic demand turn down
• EV charging at residential premises
• New Build CMU comprising of battery storage and associated plant
Active • 2027-28 (T-4), 2025-26 (T-1) ...
B80 (20 components)
• CMU consisting of multiple reciprocating engines and alternators
• EV charging at residential premises
• Municipal waste incineration plant located in Chineham Hampshire. It is based on one boiler supplying steam to a turbine-generator.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
6.71 MW
BA15 (42 components)
• EV charging at residential premises (2)
• Generating unit 3.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BA6 (16 components)
• EV charging on residential premises
• Grain B CCGT Unit 7 CHP element is via supply of heat to Grain LNG regasification facility
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BN13 (76 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BN14 (85 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BN43 (54 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
BS15 (60 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
BS16 (169 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
BS22 (76 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
23.94 MW
BS26 (26 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-1) ...
CA6 (13 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
CB10 (62 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
CB2 (47 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
CB3 (52 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
CB9 (34 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
CF15 (69 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
CF23 (101 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
3.07 MW
CF3 (87 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
CF5 (101 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
CF61 (29 components)

Domestic EV charger

Active • 2025-26 (T-1), 2024-25 (T-1) ...
Loading map...
Showing 25 locations