Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

VEOLIA UK LIMITED

140 unique locations (13091 components) - Page 1 of 6

Active MW: 110.49 MW
Inactive MW: 1030.72 MW
AB15 (83 components)
• Domestic demand turn down
• Holford Gas Storage DSR
• Load curtailment from refridgeration
Active • 2027-28 (T-4), 2025-26 (T-1) ...
AB25 (6 components)
• Domestic EV charger
• EV charging at residential premises
• Two CHP engines in horticultural environment with no auxilliary load
Active • 2025-26 (T-1), 2025-26 (T-4) ...
AL1 (92 components)
• EV charging at residential premises (2)
• EV charging on residential premises
Active • 2027-28 (T-4), 2025-26 (T-1) ...
3.07 MW
AL4 (104 components)
• EV charging at residential premises (2)
• The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA..
Active • 2027-28 (T-4), 2025-26 (T-1) ...
1.23 MW
AL5 (127 components)
• Domestic demand turn down
• EV charging at residential premises
• domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
B17 (58 components)
• A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
• EV charging at residential premises
• EV charging on residential premises
Active • 2025-26 (T-1), 2025-26 (T-4) ...
B45 (72 components)
• DSR components to be assigned prior to the start of the Delivery Year.
• EV charging at residential premises
• load curtailment at site
Active • 2027-28 (T-4), 2025-26 (T-1) ...
B61 (95 components)
• Component has yet to be procured - Unproven DSR
• EV charging at residential premises
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
B63 (53 components)
• Bus depot site
• Domestic demand turn down
• EV charging at residential premises
Active • 2025-26 (T-1), 2025-26 (T-4) ...
B73 (67 components)
• A gas engine CHP site providing hot water to a local district heating network
• Domestic demand turn down
• EV charging at residential premises
Active • 2027-28 (T-4), 2025-26 (T-1) ...
B75 (100 components)
• Domestic demand turn down
• EV charging at residential premises
• New Build CMU comprising of battery storage and associated plant
Active • 2027-28 (T-4), 2025-26 (T-1) ...
B90 (169 components)
• A gas engine CHP site providing hot water to a local district heating network
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• This CMU unit is Causeymire wind farm, an onshore wind farm located in Scotland
Active • 2027-28 (T-4), 2025-26 (T-1) ...
B91 (169 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• Energy from Waste Facility located in Grace Road, Exeter.
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste located in Glass Avenue, Cardiff.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
B93 (105 components)
• 2xHydro Generation Unit
• EV charging at residential premises
• Unit 3 at Saltend Power Station
Active • 2027-28 (T-4), 2025-26 (T-1) ...
B98 (60 components)
• A generating station consisting on multiple reciprocating engines and alternators located on a single site
• EV charging at residential premises
• Paper Mill carrying out DSR using load turn-down.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
BA12 (57 components)
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW
• Domestic demand turn down
• EV charging at residential premises
Active • 2027-28 (T-4), 2025-26 (T-1) ...
3.26 MW
BA15 (42 components)
• EV charging at residential premises (2)
• Generating unit 3.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BL0 (47 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• Cottam Development Centre (CDC) CCGT single unit station
• Load curtailment from refridgeration
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BL1 (96 components)
• Domestic demand turn down
• EV charging at residential premises
• Load curtailment from refridgeration
Active • 2027-28 (T-4), 2025-26 (T-1) ...
BN43 (54 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
BROOKFIELD DRIVE HORLEY SURREY RH6 (2 components)

EV charging at residential premises

Active • 2027-28 (T-4)
BS15 (60 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
BS16 (169 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
CF15 (69 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
CF23 (101 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
3.07 MW
Loading map...
Showing 25 locations