WALKER & SON (HAULIERS) LIMITED

6 unique locations (23 components)

Active MW: 33.46 MW
Inactive MW: 365.17 MW
1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD (3 components)
• AN 8MW new build gas generating station..
• CMU FES002 which is an electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 8MW. The CMU is located at: 1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD.
• ElecLink will have a transmission capacity of 1000MW corresponding to its grid connection agreements and link the 400kV AC grids of France and Great Britain. ElecLink will employ high voltage direct current converter stations using voltage source converter technology at each side of the Channel Tunnel. 400kV AC underground cables will connect the converter stations to the TSO's high voltage substations: Sellindge (NGET, UK) and Les Mandarins (RTE, France). The converter station on the Eurotunnel site at Folkestone will be connected by one 400kV AC cable circuit to the National Grid substation at Sellindge. The route length is approximately 14km. The converter station on the Eurotunnel site at Coquelles will be connected by one 400kV AC cable circuit to the RTE substation at Les Madarins. The route length is approximately 3.5km. An approximately 52km long HVDC cable circuit will connect the two converter stations via the Channel Tunnel between Folkestone and Coquelles. This will involve two single-core HVDC cables operating at +-320kV DC. Please note that in the section below we provided an address for the CMU which relates to the UK converter station site. Of course, given the CMU is an interconnector there are a variety of sites which are owned/managed by ElecLink and relate to the CMU, as additional information we have provided details of those sites below. Please note also that we have provided the grid reference points which most closely correspond to the sites, however the postcode for the address will capture a wider area. Sellindge substation Church Lane Aldington Ashford TN25 6SS Grid reference: TR082383 Converter station at Coquelles, France Eurotunnel Entrance Centre De Secours, 3573 Chemin Rouge Cambre, 62231 Coquelles, France Grid reference: TR657202 We wish to clarify here that while ElecLink has acceded to the BSC we have not yet begun installing or testing metering systems. Therefore, MPANs and BMU IDs do not apply to the ElecLink CMU at this point in time. ElecLink will ensure that the Delivery Body is updated as required once the metering systems are completed.
Active • 2024-25 (T-4), 2022-23 (T-3)
Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (10 components)
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG-19, EMD-19 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02). Gross 3 HH av. peak generation from Unit 5 on separate days = 141.040 MW At these three HH times, aux load on Unit 5 = 2.597 MW Net generation from Unit 5 = 138.443 MW
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG-21 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02). Gross 3 HH av. peak generation from Unit 5 on separate days = 137.533 MW At these three HH times, aux load on Unit 5 = 2.513 MW Net generation from Unit 5 = 135.020 MW
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, EPCO1. All Components of EMG-18, EMD-U3 and EMD-T1 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. Gross 3 HH av. peak generation from Unit 5 on separate days = 139.707 MW At these three HH times, aux load on Unit 5 = 2.517 MW Net generation from Unit 5 = 137.190 MW
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land And Buildings On The North East Side Of Tame Street, Stalybridge, SK15 1QF (5 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Prince of Wales Road, Darnall, South Yorkshire, Sheffield, S9 4EX, United Kingdom (2 components)

A New Build gas generating station..

Active • 2028-29 (T-4), 2027-28 (T-4)
Staythorpe BESS, Staythorpe Road, Nottinghamshire, NG23 5RE (1 component)

The CMU is a Battery Energy Storage System with a planned 437MW active power output, consisting of containerised batteries.

Active • 2027-28 (T-4)
Loading map...