Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Waterswallows Energy Limited

93 unique locations (254 components) - Page 7 of 10

KGV Pumping Station, East Camperdown Road, Dundee, DD1 3LG (2 components)

Water pumping station comprising of electrical pumps that can be modulated or turned off.

Inactive • 2022-23 (T-4)
Kenley Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (6 components)

Mix of load reduction and standby generation

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Hungry Snout RWP Crichness Duns Scottish Borders TD11 3SN (4 components)

Hungry Snout Water Pumping Station

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Holly Water Close, Torquay, TQ1 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Hempstead Lane, Hempstead, Gloucester GL2 5LF (12 components)
• Load curtailment at site
• Load curtailment at site with standby generation exporting
• Standby generation
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Heathlands Farm, Honey Hill, Wokingham, RG40 3BG (9 components)
• Water source heat pump at 1883kW each (2)
• Water source Heat Pumps at 1883KW each
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.73 MW
Hall WTW, Hall Water Treatment Works, Collingham Road, Newton-On-Trent, LINCOLN, LN1 2LL (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
HALLRAW WATER INTAKE, A57 DUNHAM BRIDGE HALL ABSTRACTION, DUNHAM RD, LN1 2JR (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Loading map...
Showing 10 locations