Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Waterswallows Energy Limited

65 unique locations (138 components) - Page 1 of 7

36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PG (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1)
BRISTOL WASTE WATER TREATMENT WORKS, KINGS WESTON LANE, BRISTOL, BS11 0YS (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
Chingford South Raw Water PS, Lea Valley Road, Enfield, London, United Kingdom, E4 7PX (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-1), 2023-24 (T-4)
Datchet 2 Raw Water PS, Horton Road, Datchet, Slough, United Kingdom, SL3 9HX (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-1), 2023-24 (T-4)
Grafham Water Treatment Works, W Perry, Huntingdon PE28 0BZ (1 component)

1.26MW Battery Storage located at Anglian Water Grafham

Active • 2024-25 (T-4)
HALLRAW WATER INTAKE, A57 DUNHAM BRIDGE HALL ABSTRACTION, DUNHAM RD, LN1 2JR (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Heathlands Farm, Honey Hill, Wokingham, RG40 3BG (9 components)
• Water source Heat Pumps at 1883KW each
• Water source Heat Pumps at 1883KW each - located at Horticultural site
• Water source heat pump at 1883kW each
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Hempstead Lane, Hempstead, Gloucester GL2 5LF (12 components)
• Load curtailment at site
• Load curtailment at site with standby generation exporting
• Standby generation
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 10 locations