Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ZENOBE ECCLES LIMITED

9 unique locations (81 components)

Active MW: 769.87 MW
Inactive MW: 334.88 MW
Cargill PLC, Trafford Park, M17 1PA (24 components)

Siemens SGT200 Based CHP

Active • 2028-29 (T-4), 2025-26 (T-4) ...
Eccles Birgham Farm TD12 4LU (3 components)
• 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
• 50MW battery storage located near to the SPT Eccles substation.
• Lithium ion battery storage plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Eccles Birgham Farm, TD12 4LU (1 component)

Lithium ion battery storage plant

Active • 2027-28 (T-4)
Energy Centre Westfield London, Ariel Way, White City, London, W12 7GF (32 components)
• A gas engine CHP site providing electricity & heat to the associated development
• On-site CHP - existing generating unit Pond Street London OS Grid Reference: TQ 272 854 NW3 2QG
• On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Hayleys Manor, Epping, CM16 6PQ (1 component)

A new build generating plant comprising containerised gas reciprocating engines, to be installed within a dedicated compound area.

Inactive • 2022-23 (T-4)
Land at Caxton Way, Dinnington, Rotherham, S25 3QE. (3 components)
• A 20MW New Build gas fuelled generating station.
• A 8MW New Build gas fuelled generating station.
• a new build gas generating station
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Radstone Rd, Radstone, Brackley NN13 5PY (7 components)
• A new build diesel or gas grid support plant
• An Existing diesel grid support plant
Active • 2025-26 (T-1), 2021-22 (T-4) ...
Sunrise House Hulley Road Macclesfield Cheshire SK10 2LP (3 components)

20.000 MW of battery storage located at Macclesfield.

Inactive • 2023-24 (T-4), 2020-21 (T-1) ...
WESTFIELD LANE KIPPAX LEEDS LS25 (7 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2024-25 (T-1) ...
15.39 MW
Loading map...
Showing 9 locations