Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ZENOBE ENERGY LIMITED

88 unique locations (5182 components) - Page 1 of 4

Active MW: 138.62 MW
Inactive MW: 966.13 MW
YORKTOWN ROAD COLLEGE TOWN SANDHURST BERKSHIRE GU47 (3 components)
• "Portsmouth Water Hoads Hill, Wickham, Fareham, P017 5BX The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency purposes that is not used to provide DSR capacity."
• 390kW Battery Storage located at Stagecoach Guildford depot
• Domestic EV charger
Active • 2025-26 (T-4), 2021-22 (T-1) ...
Yardley Wood Bus Depot, Yardley Wood Rd, Yardley Wood, Birmingham, B14 4BN (16 components)
• 0.52 MW Battery Storage located at National Express Yardley Wood.
• 0.52MW Battery Storage located at National Express Yardley Wood
Active • 2026-27 (T-4), 2025-26 (T-4) ...
WS3 (40 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
WS13 (104 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
WHEATLANDS LOW WORSALL YARM TS15 (3 components)
• "Portsmouth Water Lovedean Pumping Station, Lovedean Lane, Waterlooville, P08 9RY The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency purposes that is not used to provide DSR capacity."
• 0.39MW Battery Storage located at Newport Bus depot
• Domestic EV charger
Active • 2025-26 (T-4), 2021-22 (T-1) ...
WA8 (109 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
3.50 MW
WA5 (220 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
WA3 (127 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
WA16 (81 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
TW11 (41 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
TQ9 (41 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
TQ12 (107 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
TOMS LANE, KINGS LANGLEY, HERTFORDSHIRE, WD4 (2 components)

EV charging on residential premises

Active • 2026-27 (T-4)
2.07 MW
TN7 (9 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-1) ...
TN22 (80 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
TEMPLETON DRIVE, FEARNHEAD, WARRINGTON, CHESHIRE, WA2 (2 components)

EV charging on residential premises

Active • 2026-27 (T-4)
2.07 MW
SY7 (15 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
Swanage Close Yarm Cleveland TS15 (1 component)

0.39MW Battery Storage located at Newport Bus depot

Inactive • 2023-24 (T-1)
SW17 0JH (1 component)

bus depot site

Active • 2025-26 (T-4)
St Joseph Place Llantarnam Cwmbran Gwent. NP44 (1 component)

1.2MW Battery Storage located at National Express Coventry

Inactive • 2022-23 (T-1)
SS0 (26 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
2.07 MW
SN8 (78 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
2.07 MW
SK7 (170 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
2.07 MW
SK14 (64 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
3.50 MW
SA43 (12 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-1) ...
2.29 MW
Loading map...
Showing 25 locations