Uskmouth Power Station West Nash Road, Nash, Newport, Wales, NP18 2BZ
NP18 2BZ
Last updated: 20 Jul 2025 10:07 UTC
1 Component Storage (Duration 2h) AW1 ENERGY STORAGE LIMITED
Total Capacity: 20.10 MW
Components: 1
Technologies:
Storage (Duration 2h)
Unique CMUs: 1

Secondary Trading Contacts

Contact Information

Component Descriptions

AW1 Energy Storage Limited (AW1) will develop a Battery Energy Storage System (BESS) at land adjacent to the substation and will initially develop a 120 MW / 240 MWh BESS at land adjacent to the substation, with energisation in October 2026 to achieve the Grid Connection Agreement with NGESO for connection to Uskmouth Substation at 132 kV. AW1 are developing then plans which include suitable Capacity Maintenance / Augmentation, and further are developing plans due to available space that the site system could be expanded in the future should the opportunity prevail.

Used by 1 CMU

CMU Identifiers

1 CMU at this location (showing first 1):

USKAW1

Components at this Location

Click on yellow auction year badges to see individual component pages

AW1 Energy Storage Limited (AW1) will develop a Battery Energy Storage System (BESS) at land adjacent to the substation and will initially develop a 120 MW / 240 MWh BESS at land adjacent to the substation, with energisation in October 2026 to achieve the Grid Connection Agreement with NGESO for connection to Uskmouth Substation at 132 kV. AW1 are developing then plans which include suitable Capacity Maintenance / Augmentation, and further are developing plans due to available space that the site system could be expanded in the future should the opportunity prevail.
CMU: USKAW1
Storage (Duration 2h) AW1 ENERGY STORAGE LIMITED Parent: AW1 Storage Holdings Limited
Capacity Information:
De-Rated Capacity (Registry) 20.102
Connection/DSR Capacity 96
Anticipated Capacity 20.102