BATTERSEA POWER STATION LONDON SW11 8AH
SW11 8AH
Last updated: 24 Jul 2025 13:59 UTC
8 Components Combined Heat and Power (CHP) LIMEJUMP LTD
Total Capacity: 10.19 MW
Components: 8
Technologies:
Combined Heat and Power (CHP)
Unique CMUs: 3

Secondary Trading Contacts

Component Descriptions

Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the overall CMU capacity of 3.557 MW as per the 3 highest export peaks.

Used by 3 CMUs

CMU Identifiers

3 CMUs at this location (showing first 3):

BAT001 BAT002 BPS001

Components at this Location

Click on yellow auction year badges to see individual component pages

Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the overall CMU capacity of 3.557 MW as per the 3 highest export peaks.
CMU: BAT001
Combined Heat and Power (CHP) LIMEJUMP LTD Parent: The Shell Petroleum Company Limited
Capacity Information:
De-Rated Capacity (Registry) 0.372
Connection/DSR Capacity 1.5
Anticipated Capacity 0.372
CMU: BAT002
Combined Heat and Power (CHP) LIMEJUMP LTD Parent: The Shell Petroleum Company Limited
Capacity Information:
De-Rated Capacity (Registry) 0.322
Connection/DSR Capacity 1.3
Anticipated Capacity 0.322
CMU: BPS001
Combined Heat and Power (CHP) BRING ENERGY LIMITED Parent: Bring Energy Group Limited
Capacity Information:
De-Rated Capacity (Registry) 3.258
Connection/DSR Capacity 3.558