Land east of Gainsborough Road Bole Nottinghamshire DN22 9EY
DN22 9EY
Last updated: 30 Jul 2025 05:22 UTC
4 Components Battery Storage (Duration 4h) WEST BURTON C LIMITED
Total Capacity: 208.70 MW
Components: 4
Technologies:
Battery, Storage (Duration 4h)
Unique CMUs: 4

Secondary Trading Contacts

Contact Information

Component Descriptions

New-build generating CMU comprising battery storage and associated plant to be constructed adjacent to the existing West Burton B CCGT, Nottinghamshire. Metering of output is Net of auxillary load.

Used by 4 CMUs

CMU Identifiers

4 CMUs at this location (showing first 4):

24WBC1 24WBC2 24WBC3 24WBC4

Components at this Location

Click on yellow auction year badges to see individual component pages

New-build generating CMU comprising battery storage and associated plant to be constructed adjacent to the existing West Burton B CCGT, Nottinghamshire. Metering of output is Net of auxillary load.
CMU: 24WBC1
Storage (Duration 4h) WEST BURTON C LIMITED Parent: Fidra Energy Projects Limited
Capacity Information:
De-Rated Capacity (Registry) 52.175
Connection/DSR Capacity 125
Anticipated Capacity 52.175
CMU: 24WBC2
Storage (Duration 4h) WEST BURTON C LIMITED Parent: Fidra Energy Projects Limited
Capacity Information:
De-Rated Capacity (Registry) 52.175
Connection/DSR Capacity 125
Anticipated Capacity 52.175
CMU: 24WBC3
Storage (Duration 4h) WEST BURTON C LIMITED Parent: Fidra Energy Projects Limited
Capacity Information:
De-Rated Capacity (Registry) 52.175
Connection/DSR Capacity 125
Anticipated Capacity 52.175
CMU: 24WBC4
Storage (Duration 4h) WEST BURTON C LIMITED Parent: Fidra Energy Projects Limited
Capacity Information:
De-Rated Capacity (Registry) 52.175
Connection/DSR Capacity 125
Anticipated Capacity 52.175