Tongland, Kirkcudbrightshire. DG6 4LT. Scotland
DG6 4LT
Last updated: 02 Aug 2025 07:20 UTC
12 Components Hydro DRAX RIVER HYDRO LIMITED
Total Capacity: N/A
Components: 12
Technologies:
Hydro
Unique CMUs: 3

Secondary Trading Contacts

Contact Information

Component Descriptions

Tongland hydro power station - Unit 1 Part of the Galloway hydroelectric scheme Registered capacity = 41.25MVA or 33MW at 0.8PF. Each of the 3 components = 11MW.

Used by 3 CMUs

Tongland hydro power station - Unit 2 Part of the Galloway hydroelectric scheme Registered capacity = 41.25MVA or 33MW at 0.8PF. Each of the 3 components = 11MW.

Used by 3 CMUs

Tongland hydro power station - Unit 3 Part of the Galloway hydroelectric scheme Registered capacity = 41.25MVA or 33MW at 0.8PF. Each of the 3 components = 11MW.

Used by 3 CMUs

CMU Identifiers

3 CMUs at this location (showing first 3):

SP16TO SP17TO SP18TO

Components at this Location

Click on yellow auction year badges to see individual component pages

Tongland hydro power station - Unit 1 Part of the Galloway hydroelectric scheme Registered capacity = 41.25MVA or 33MW at 0.8PF. Each of the 3 components = 11MW.
CMU: SP16TO
Capacity Information:
De-Rated Capacity (Registry) 29.761
Connection/DSR Capacity 34.541
Anticipated Capacity 29.761
CMU: SP17TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 30.368
Connection/DSR Capacity 34.541
Anticipated Capacity 30.368
2021-22 (T-4) Four Year Ahead Capacity Auction
CMU: SP18TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 31.177
Connection/DSR Capacity 34.607
Anticipated Capacity 31.177
2022-23 (T-4) Four Year Ahead Capacity Auction
Tongland hydro power station - Unit 2 Part of the Galloway hydroelectric scheme Registered capacity = 41.25MVA or 33MW at 0.8PF. Each of the 3 components = 11MW.
CMU: SP16TO
Capacity Information:
De-Rated Capacity (Registry) 29.761
Connection/DSR Capacity 34.541
Anticipated Capacity 29.761
CMU: SP17TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 30.368
Connection/DSR Capacity 34.541
Anticipated Capacity 30.368
2021-22 (T-4) Four Year Ahead Capacity Auction
CMU: SP18TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 31.177
Connection/DSR Capacity 34.607
Anticipated Capacity 31.177
2022-23 (T-4) Four Year Ahead Capacity Auction
Tongland hydro power station - Unit 3 Part of the Galloway hydroelectric scheme Registered capacity = 41.25MVA or 33MW at 0.8PF. Each of the 3 components = 11MW.
CMU: SP16TO
Capacity Information:
De-Rated Capacity (Registry) 29.761
Connection/DSR Capacity 34.541
Anticipated Capacity 29.761
2020-21 (T-4) Four Year Ahead Capacity Auction 2017-18 (T-1) One Year Ahead Capacity Auction
CMU: SP17TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 30.368
Connection/DSR Capacity 34.541
Anticipated Capacity 30.368
2021-22 (T-4) Four Year Ahead Capacity Auction
CMU: SP18TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 31.177
Connection/DSR Capacity 34.607
Anticipated Capacity 31.177