Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help
Capacity Market Search
Menu
Home
  • Technologies
  • Companies
  • Locations
  • Map Explorer
  • FAQ
  • Trading Board
  • ChatGPT

  • Buy Me A Coffee
  • Help

  • Login
  • Register

  • Theme
  • Light
  • Dark
  • Auto
  • Understanding AuctionsSearch ResultsComponent GroupingSortingMap ViewContact Us

    Search Guide

    This registry provides comprehensive search capabilities across all Capacity Market components:

    • Company Search: Enter a company name (e.g., "Drax", "EDF") to see all their components
    • Location Search: Search by city, region, or postcode (e.g., "Manchester", "SW1")
    • CMU ID Search: Enter a specific CMU ID to find exact components
    • Technology Search: Enter technology types like "Hydro", "OCGT", or "Battery"

    The search is intelligent and will try to determine what you're looking for based on your query.

    You can combine search terms to narrow results, such as "London Battery" to find battery storage in London.

    Searches are not case-sensitive, and partial matches are supported (e.g., "Manch" will find "Manchester").

    Understanding Auctions

    The Capacity Market runs regular auctions where providers compete to secure agreements. There are two main types:

    • T-4 auctions: Held 4 years ahead of the delivery year
    • T-1 auctions: Held 1 year ahead to fine-tune capacity requirements

    Each auction results in agreements that specify how much capacity providers must deliver and the payment they'll receive.

    Auction years are displayed as badges (e.g., 2023-24) that you can click to view details for that specific auction year.

    The Capacity Market ensures the UK has sufficient electricity supply during periods of high demand or system stress.

    Providers receive payments for ensuring their capacity is available, creating a more stable and resilient electricity market.

    Search Results

    Search results are grouped by location and show important details about each component:

    • Active Components with auction years 2024-25 or later
    • In-Active Components with only auction years before 2024-25
    • Company Name Click to view all components for this company
    • Technology Click to search for this technology type
    • CMU: XXX Click to search for this CMU ID
    • Auction Year Click to view details for this specific auction

    Each result shows the component's capacity, location details, and participation in specific auction years.

    You can sort results by relevance, location, or date using the sort options.

    Pagination controls appear at the bottom when there are multiple pages of results.

    Component Grouping

    Components at the same location with the same description are grouped together to reduce duplication.

    Each group shows:

    • All CMU IDs for components at that location
    • All auction years, sorted with newest first
    • An Active/Inactive status based on auction years

    Grouping helps identify multi-year contracts and related components at the same site.

    The total capacity shown combines all components in the group.

    Components can be expanded to show individual details by clicking the expand icon.

    Sorting and Filtering

    You can sort search results by:

    • Relevance: Most relevant matches first
    • Location: Alphabetical order by location name
    • Date: By auction year (newest or oldest first)
    • Capacity: Highest or lowest capacity first

    Click the column headers to change sort order.

    You can filter results using the search refinements at the top of the results page:

    • Filter by technology type (e.g., only show batteries)
    • Filter by active status (show only active or inactive components)
    • Filter by auction year (show only components from specific auctions)

    Map Explorer & Map View

    We provide two map-based tools for exploring capacity market data:

    Map Explorer

    The Map Explorer is our advanced interactive mapping tool, specifically designed for comprehensive data exploration with:

    • Mobile-Optimized Interface: Responsive design that works perfectly on phones and tablets
    • Advanced Filtering: Filter by technology type, company, delivery year, and active status
    • Smart Sidebar: Desktop users get a dedicated filter panel, mobile users get collapsible filters
    • Full-Screen Map: Maximizes map space for detailed geographical analysis
    Search Map View

    The Search Map View combines search functionality with map visualization, offering:

    • Search-First Approach: Start with text searches, then visualize results on the map
    • Integrated Results: Search results and map display work together
    • Performance Optimized: Streamlined for fast search result mapping

    Both tools provide a visual representation of capacity distribution across the UK, but serve different exploration needs.

    Map Features:
    • Technology Colors: Different technology types are shown with distinct colors on the map for easy identification:
      GasDSRNuclearCHPSolarWind
      BatteryBiomassHydroInterconnectorCoalOther
    • Technology Legend: The map legend shows all available technologies with their corresponding colors and component counts
    • Search Results on Map: You can view any search results on the map by clicking "View on Map" from search results pages
    • Smart Clustering: Areas with multiple components are automatically grouped into clusters - click clusters to zoom in and see individual components
    • Interactive Markers: Click on individual markers to see detailed information about components at that location

    Use the map controls to zoom in on specific regions or areas of interest. The map automatically adjusts clustering based on your zoom level to provide the clearest view of capacity distribution.

    Contact Us

    We're here to help with any questions about the Capacity Market Registry.

    Email

    For general inquiries and support:

    For LLMs

    Complete programmatic access guide for LLMs:

    Search / All Locations / All Postcodes / PO32 / PO32 6JS

    Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS

    396.23 MW
    Total Capacity
    PO32 6JS
    Postcode
    27
    Components
    Prequalified
    Prequalification
    Balancing Reserve
    * Latest auction year on record
    Descriptions:
    • Cowes 2 - OCGT, fuel is distillate
    • Cowes 1 - OCGT, fuel is distillate
    • Cowes 1 - OCGT, fuel is distillate MSID: 4548
    Auction Status:
    Active2028-29
    Secondary Trading Contacts
    RWE GENERATION UK PLC:
    RWE GENERATION UK PLC:

    CMU Registry Data

    CMU COW224
    65.443 RWE GENERATION UK …
    Prequalified
  • ✓ Prequalified
  • 2028-29
    Capacity Information
    De-Rated Capacity
    65.443
    Connection/DSR Capacity
    70
    Anticipated Capacity
    65.443
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Distillate
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2028-COW224-001
    Agreement Term
    1
    _id
    15265
    CMU ID
    COW224
    Auction
    Capacity Auction
    Auction Name
    2028-29 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_COWE2
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    Date of Issue of Capacity Agreement
    2025-04-04
    Auction Acquired Capacity Obligation
    65.443
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2028/2029
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2028-29T-42028-29 (T-4) Four Year Ahead Capacity Auction
    65.44 MW Prequalified
    Component ID: 411492
    Capacity: 65.44 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Primary Fuel of Component: Distillate
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Cowes 2 - OCGT, fuel is distillate MSID: 4548
    CMU COW124
    65.443 RWE GENERATION UK …
    Prequalified
  • ✓ Prequalified
  • 2028-29
    Capacity Information
    De-Rated Capacity
    65.443
    Connection/DSR Capacity
    70
    Anticipated Capacity
    65.443
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Distillate
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2028-COW124-001
    Agreement Term
    1
    _id
    15264
    CMU ID
    COW124
    Auction
    Capacity Auction
    Auction Name
    2028-29 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_COWE1
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    Date of Issue of Capacity Agreement
    2025-04-04
    Auction Acquired Capacity Obligation
    65.443
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2028/2029
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2028-29T-42028-29 (T-4) Four Year Ahead Capacity Auction
    65.44 MW Prequalified
    Component ID: 411488
    Capacity: 65.44 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Primary Fuel of Component: Distillate
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Cowes 1 - OCGT, fuel is distillate MSID: 4548
    CMU COW123
    66.045 RWE GENERATION UK …
    Prequalified
  • ✓ Prequalified
  • 2027-28
    Capacity Information
    De-Rated Capacity
    66.045
    Connection/DSR Capacity
    70
    Anticipated Capacity
    66.045
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Distillate
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2027-COW123-001
    Agreement Term
    1
    _id
    14396
    CMU ID
    COW123
    Auction
    Capacity Auction
    Auction Name
    2027-28 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_COWE1
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2024-04-08
    Auction Acquired Capacity Obligation
    66.045
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2027/2028
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2027-28T-42027-28 (T-4) Four Year Ahead Capacity Auction
    66.05 MW Prequalified
    Component ID: 1666
    Capacity: 66.05 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Primary Fuel of Component: Distillate
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Cowes 1 - OCGT, fuel is distillate MSID: 4548
    CMU COW223
    66.045 RWE GENERATION UK …
    Prequalified
  • ✓ Prequalified
  • 2027-28
    Capacity Information
    De-Rated Capacity
    66.045
    Connection/DSR Capacity
    70
    Anticipated Capacity
    66.045
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Distillate
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2027-COW223-001
    Agreement Term
    1
    _id
    14397
    CMU ID
    COW223
    Auction
    Capacity Auction
    Auction Name
    2027-28 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_COWE2
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2024-04-08
    Auction Acquired Capacity Obligation
    66.045
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2027/2028
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2027-28T-42027-28 (T-4) Four Year Ahead Capacity Auction
    66.05 MW Prequalified
    Component ID: 291781
    Capacity: 66.05 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Primary Fuel of Component: Distillate
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Cowes 2 - OCGT, fuel is distillate MSID: 4548
    CMU COW222
    66.626 RWE GENERATION UK …
    Prequalified
  • ✓ Prequalified
  • 2026-27
    Capacity Information
    De-Rated Capacity
    66.626
    Connection/DSR Capacity
    70
    Anticipated Capacity
    66.626
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Distillate
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2026-COW222-001
    Agreement Term
    1
    _id
    13509
    CMU ID
    COW222
    Auction
    Capacity Auction
    Auction Name
    2026-27 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_COWE2
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2023-03-31
    Auction Acquired Capacity Obligation
    66.626
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2026/2027
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2026-27T-42026-27 (T-4) Four Year Ahead Capacity Auction
    66.63 MW Prequalified
    Component ID: 281912
    Capacity: 66.63 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Cowes 2 - OCGT, fuel is distillate MSID: 4548
    CMU COW122
    66.626 RWE GENERATION UK …
    Prequalified
  • ✓ Prequalified
  • 2026-27
    Capacity Information
    De-Rated Capacity
    66.626
    Connection/DSR Capacity
    70
    Anticipated Capacity
    66.626
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Distillate
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2026-COW122-001
    Agreement Term
    1
    _id
    13508
    CMU ID
    COW122
    Auction
    Capacity Auction
    Auction Name
    2026-27 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_COWE1
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2023-03-31
    Auction Acquired Capacity Obligation
    66.626
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2026/2027
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2026-27T-42026-27 (T-4) Four Year Ahead Capacity Auction
    66.63 MW Prequalified
    Component ID: 291454
    Capacity: 66.63 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Cowes 1 - OCGT, fuel is distillate MSID: 4548
    CMU COW121
    66.829 RWE GENERATION UK …
    Prequalified
  • ✓ Prequalified
  • 2025-26
    Capacity Information
    De-Rated Capacity
    66.829
    Connection/DSR Capacity
    70
    Anticipated Capacity
    66.829
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Distillate
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2025-COW121-001
    Agreement Term
    1
    _id
    12590
    CMU ID
    COW121
    Auction
    Capacity Auction
    Auction Name
    2025-26 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_COWE1
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2022-04-01
    Auction Acquired Capacity Obligation
    66.829
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2025/2026
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2025-26T-42025-26 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 149463
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Cowes 1 - OCGT, fuel is distillate MSID: 4548
    CMU COW221
    66.829 RWE GENERATION UK …
    Prequalified
  • ✓ Prequalified
  • 2025-26
    Capacity Information
    De-Rated Capacity
    66.829
    Connection/DSR Capacity
    70
    Anticipated Capacity
    66.829
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Distillate
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2025-COW221-001
    Agreement Term
    1
    _id
    12591
    CMU ID
    COW221
    Auction
    Capacity Auction
    Auction Name
    2025-26 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_COWE2
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2022-04-01
    Auction Acquired Capacity Obligation
    66.829
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2025/2026
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2025-26T-42025-26 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 184421
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Cowes 2 - OCGT, fuel is distillate MSID: 4548
    CMU COW220
    66.654 RWE GENERATION UK …
    Prequalified
  • ✓ Prequalified
  • 2024-25
    Capacity Information
    De-Rated Capacity
    66.654
    Connection/DSR Capacity
    70
    Anticipated Capacity
    66.654
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Distillate
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2024-COW220-001
    Agreement Term
    1
    _id
    11098
    CMU ID
    COW220
    Auction
    Capacity Auction
    Auction Name
    2024-25 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_COWE2
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2021-04-19
    Auction Acquired Capacity Obligation
    66.654
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2024/2025
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2024-25T-42024-25 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 366297
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Cowes 2 - OCGT, fuel is distillate MSID: 4548
    CMU COW120
    66.654 RWE GENERATION UK …
    Prequalified
  • ✓ Prequalified
  • 2024-25
    Capacity Information
    De-Rated Capacity
    66.654
    Connection/DSR Capacity
    70
    Anticipated Capacity
    66.654
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Distillate
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2024-COW120-001
    Agreement Term
    1
    _id
    11097
    CMU ID
    COW120
    Auction
    Capacity Auction
    Auction Name
    2024-25 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_COWE1
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2021-04-19
    Auction Acquired Capacity Obligation
    66.654
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2024/2025
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2024-25T-42024-25 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 158809
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Cowes 1 - OCGT, fuel is distillate MSID: 4548
    CMU COW192
    66.486 RWE GENERATION UK …
    Prequalified
  • ✓ Prequalified
  • 2023-24
    Capacity Information
    De-Rated Capacity
    66.486
    Connection/DSR Capacity
    70
    Anticipated Capacity
    66.486
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Distillate
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2023-COW192-001
    Agreement Term
    1
    _id
    9589
    CMU ID
    COW192
    Auction
    Capacity Auction
    Auction Name
    2023-24 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_COWE2
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2020-04-17
    Auction Acquired Capacity Obligation
    66.486
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2023/2024
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 277297
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Cowes 2 - OCGT, fuel is distillate MSID: 4548
    CMU COW191
    66.486 RWE GENERATION UK …
    Prequalified
  • ✓ Prequalified
  • 2023-24
    Capacity Information
    De-Rated Capacity
    66.486
    Connection/DSR Capacity
    70
    Anticipated Capacity
    66.486
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Distillate
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2023-COW191-001
    Agreement Term
    1
    _id
    9588
    CMU ID
    COW191
    Auction
    Capacity Auction
    Auction Name
    2023-24 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_COWE1
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2020-04-17
    Auction Acquired Capacity Obligation
    66.486
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2023/2024
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 291729
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Cowes 1 - OCGT, fuel is distillate MSID: 4548
    CMU CW2182
    66.486 RWE GENERATION UK …
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    66.486
    Connection/DSR Capacity
    70
    Anticipated Capacity
    66.486
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Distillate
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2022-CW2182-001
    Agreement Term
    1
    _id
    7007
    CMU ID
    CW2182
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-3) Three Year Ahead Capacity Auction
    CM Unit Name
    CMU_COWE2
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2020-03-11
    Auction Acquired Capacity Obligation
    66.486
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2022/2023
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    Prequalified
    Component ID: 282300
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Cowes 2 - OCGT, fuel is distillate MSID: 4548
    CMU CW2181
    66.486 RWE GENERATION UK …
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    66.486
    Connection/DSR Capacity
    70
    Anticipated Capacity
    66.486
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Distillate
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2022-CW2181-001
    Agreement Term
    1
    _id
    7006
    CMU ID
    CW2181
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-3) Three Year Ahead Capacity Auction
    CM Unit Name
    CMU_COWE1
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2020-03-11
    Auction Acquired Capacity Obligation
    66.486
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2022/2023
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    Prequalified
    Component ID: 281950
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Cowes 1 - OCGT, fuel is distillate MSID: 4548
    CMU COW181
    66.598 RWE GENERATION UK …
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    66.598
    Connection/DSR Capacity
    70
    Anticipated Capacity
    66.598
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Distillate
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Opt Out Status
    Opt-In
    Agreement Details
    _id
    8043
    CMU ID
    COW181
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_COWE1
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+4401793475215
    Auction Participation History
    2022-23T-42022-23 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 277640
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Cowes 1 - OCGT, fuel is distillate
    CMU COW182
    66.598 RWE GENERATION UK …
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2022-23 2019-2022
    Capacity Information
    De-Rated Capacity
    66.598
    Connection/DSR Capacity
    70
    Anticipated Capacity
    66.598
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Distillate
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Opt Out Status
    Opt-In
    Agreement Details
    _id
    8044
    CMU ID
    COW182
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_COWE2
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+4401793475215
    Auction Participation History
    2022-23T-42022-23 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 282086
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Cowes 2 - OCGT, fuel is distillate
    2019-20T-12019-20 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 536706
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Cowes 2 - OCGT, fuel is distillate
    2019-20T-12019-20 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 585464
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Cowes 2 - OCGT, fuel is distillate
    CMU COW172
    63.911 RWE GENERATION UK …
    Prequalified
  • ✓ Prequalified
  • 2021-22
    Capacity Information
    De-Rated Capacity
    63.911
    Connection/DSR Capacity
    67.41
    Anticipated Capacity
    63.911
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Distillate
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2021-COW172-001
    Agreement Term
    1
    _id
    5302
    CMU ID
    COW172
    Auction
    Capacity Auction
    Auction Name
    2021-22 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_COWE2
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2018-03-20
    Auction Acquired Capacity Obligation
    63.911
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2021/2022
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2021-22T-42021-22 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 277280
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Generating Technology Class: OCGT and Reciprocating Engines
    • Description of CMU Components: Cowes 2 - OCGT, fuel is distillate
    CMU COW171
    66.367 RWE GENERATION UK …
    Prequalified
  • ✓ Prequalified
  • 2021-22
    Capacity Information
    De-Rated Capacity
    66.367
    Connection/DSR Capacity
    70
    Anticipated Capacity
    66.367
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Distillate
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2021-COW171-001
    Agreement Term
    1
    _id
    5301
    CMU ID
    COW171
    Auction
    Capacity Auction
    Auction Name
    2021-22 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_COWE1
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2018-03-20
    Auction Acquired Capacity Obligation
    66.367
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2021/2022
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2021-22T-42021-22 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 194136
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Generating Technology Class: OCGT and Reciprocating Engines
    • Description of CMU Components: Cowes 1 - OCGT, fuel is distillate
    CMU COW161
    46.613 RWE GENERATION UK …
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2020-21 2017-2020
    Capacity Information
    De-Rated Capacity
    46.613
    Connection/DSR Capacity
    49.499
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2017-COW161-001
    Agreement Term
    1
    _id
    296
    CMU ID
    COW161
    Auction
    Capacity Auction
    Auction Name
    2017-18 (T-1) One Year Ahead Capacity Auction
    CM Unit Name
    CMU_COWE1
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Date of Issue of Capacity Agreement
    2017-02-15
    Auction Acquired Capacity Obligation
    46.613
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2017/2018
    Auction Participation History
    2020-21T-42020-21 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 366388
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Description of CMU Components: Cowes 1 - OCGT, fuel is gas-oil
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 540386
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Description of CMU Components: Cowes 1 - OCGT, fuel is gas-oil
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 589144
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Description of CMU Components: Cowes 1 - OCGT, fuel is gas-oil
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 589126
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Description of CMU Components: Cowes 1 - OCGT, fuel is gas-oil
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 665514
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Description of CMU Components: Cowes 1 - OCGT, fuel is gas-oil
    CMU COW162
    46.562 RWE GENERATION UK …
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2020-21 2017-2020
    Capacity Information
    De-Rated Capacity
    46.562
    Connection/DSR Capacity
    49.445
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2017-COW162-001
    Agreement Term
    1
    _id
    297
    CMU ID
    COW162
    Auction
    Capacity Auction
    Auction Name
    2017-18 (T-1) One Year Ahead Capacity Auction
    CM Unit Name
    CMU_COWE2
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Date of Issue of Capacity Agreement
    2017-02-15
    Auction Acquired Capacity Obligation
    46.562
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2017/2018
    Auction Participation History
    2020-21T-42020-21 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 282836
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Description of CMU Components: Cowes 2 - OCGT, fuel is gas-oil
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 535913
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Description of CMU Components: Cowes 2 - OCGT, fuel is gas-oil
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 661041
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Description of CMU Components: Cowes 2 - OCGT, fuel is gas-oil
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 584653
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SZ 505 944
    • Location and Post Code: Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS
    • Description of CMU Components: Cowes 2 - OCGT, fuel is gas-oil
    Welcome to Capacity Market Search
    🗺️ 1 week free trial to explore all features!

    You can explore the basic features, but will need to register for continued access to premium features like the interactive map.

    Choose your contribution amount
    Unlimited access to all premium features

    Secure payment • No subscription • Lifetime access