Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help
Capacity Market Search
Menu
Home
  • Technologies
  • Companies
  • Locations
  • Map Explorer
  • FAQ
  • Trading Board
  • ChatGPT

  • Buy Me A Coffee
  • Help

  • Login
  • Register

  • Theme
  • Light
  • Dark
  • Auto
  • Understanding AuctionsSearch ResultsComponent GroupingSortingMap ViewContact Us

    Search Guide

    This registry provides comprehensive search capabilities across all Capacity Market components:

    • Company Search: Enter a company name (e.g., "Drax", "EDF") to see all their components
    • Location Search: Search by city, region, or postcode (e.g., "Manchester", "SW1")
    • CMU ID Search: Enter a specific CMU ID to find exact components
    • Technology Search: Enter technology types like "Hydro", "OCGT", or "Battery"

    The search is intelligent and will try to determine what you're looking for based on your query.

    You can combine search terms to narrow results, such as "London Battery" to find battery storage in London.

    Searches are not case-sensitive, and partial matches are supported (e.g., "Manch" will find "Manchester").

    Understanding Auctions

    The Capacity Market runs regular auctions where providers compete to secure agreements. There are two main types:

    • T-4 auctions: Held 4 years ahead of the delivery year
    • T-1 auctions: Held 1 year ahead to fine-tune capacity requirements

    Each auction results in agreements that specify how much capacity providers must deliver and the payment they'll receive.

    Auction years are displayed as badges (e.g., 2023-24) that you can click to view details for that specific auction year.

    The Capacity Market ensures the UK has sufficient electricity supply during periods of high demand or system stress.

    Providers receive payments for ensuring their capacity is available, creating a more stable and resilient electricity market.

    Search Results

    Search results are grouped by location and show important details about each component:

    • Active Components with auction years 2024-25 or later
    • In-Active Components with only auction years before 2024-25
    • Company Name Click to view all components for this company
    • Technology Click to search for this technology type
    • CMU: XXX Click to search for this CMU ID
    • Auction Year Click to view details for this specific auction

    Each result shows the component's capacity, location details, and participation in specific auction years.

    You can sort results by relevance, location, or date using the sort options.

    Pagination controls appear at the bottom when there are multiple pages of results.

    Component Grouping

    Components at the same location with the same description are grouped together to reduce duplication.

    Each group shows:

    • All CMU IDs for components at that location
    • All auction years, sorted with newest first
    • An Active/Inactive status based on auction years

    Grouping helps identify multi-year contracts and related components at the same site.

    The total capacity shown combines all components in the group.

    Components can be expanded to show individual details by clicking the expand icon.

    Sorting and Filtering

    You can sort search results by:

    • Relevance: Most relevant matches first
    • Location: Alphabetical order by location name
    • Date: By auction year (newest or oldest first)
    • Capacity: Highest or lowest capacity first

    Click the column headers to change sort order.

    You can filter results using the search refinements at the top of the results page:

    • Filter by technology type (e.g., only show batteries)
    • Filter by active status (show only active or inactive components)
    • Filter by auction year (show only components from specific auctions)

    Map Explorer & Map View

    We provide two map-based tools for exploring capacity market data:

    Map Explorer

    The Map Explorer is our advanced interactive mapping tool, specifically designed for comprehensive data exploration with:

    • Mobile-Optimized Interface: Responsive design that works perfectly on phones and tablets
    • Advanced Filtering: Filter by technology type, company, delivery year, and active status
    • Smart Sidebar: Desktop users get a dedicated filter panel, mobile users get collapsible filters
    • Full-Screen Map: Maximizes map space for detailed geographical analysis
    Search Map View

    The Search Map View combines search functionality with map visualization, offering:

    • Search-First Approach: Start with text searches, then visualize results on the map
    • Integrated Results: Search results and map display work together
    • Performance Optimized: Streamlined for fast search result mapping

    Both tools provide a visual representation of capacity distribution across the UK, but serve different exploration needs.

    Map Features:
    • Technology Colors: Different technology types are shown with distinct colors on the map for easy identification:
      GasDSRNuclearCHPSolarWind
      BatteryBiomassHydroInterconnectorCoalOther
    • Technology Legend: The map legend shows all available technologies with their corresponding colors and component counts
    • Search Results on Map: You can view any search results on the map by clicking "View on Map" from search results pages
    • Smart Clustering: Areas with multiple components are automatically grouped into clusters - click clusters to zoom in and see individual components
    • Interactive Markers: Click on individual markers to see detailed information about components at that location

    Use the map controls to zoom in on specific regions or areas of interest. The map automatically adjusts clustering based on your zoom level to provide the clearest view of capacity distribution.

    Contact Us

    We're here to help with any questions about the Capacity Market Registry.

    Email

    For general inquiries and support:

    For LLMs

    Complete programmatic access guide for LLMs:

    Search / All Locations / All Postcodes / RM18 / RM18 8UL_2

    land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.

    169.83 MW
    Total Capacity
    RM18 8UL
    Postcode
    6
    Components
    Active*
    2025-26 (T-4)
    Prequalified
    Prequalification
    * Latest auction year on record
    Descriptions:
    • Gas reciprocating engines
    • Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
    • Battery Storage plant
    Auction Status:
    Active2027-28
    Other Locations at This Postcode 2 locations
    land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL 23.09 MW
    Storage (Duration 2h) THURROCK STORAGE LIMITED4 components
    Tilbury STW, TILBURY-STW, Fort Road, TILBURY Essex, RM18 8UL,
    DSR ENEL X UK LIMITED5 components
    Secondary Trading Contacts
    THURROCK FLEXIBLE GENERATION LIMITED:

    CMU Registry Data

    CMU SEL135
    169.83 THURROCK POWER LIMITED
    Prequalified
  • ✓ Prequalified
  • 2027-28
    Capacity Information
    De-Rated Capacity
    169.83
    Connection/DSR Capacity
    180
    Anticipated Capacity
    169.83
    Max Obligation Period
    15
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    New Build Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Statera Energy Limited
    Registered Holder
    THURROCK POWER LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2027-SEL135-001
    Agreement Term
    15
    _id
    14866
    CMU ID
    SEL135
    Auction
    Capacity Auction
    Auction Name
    2027-28 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Thurrock Storage 2 Limited
    Name of Applicant
    THURROCK POWER LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    Nature of the Security Interest
    1.By charges and assignments contained in a debenture dated 31 October 2024
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    Date of Issue of Capacity Agreement
    2024-04-08
    Auction Acquired Capacity Obligation
    169.83
    Secondary Trading Contact - Telephone
    '+4402071860586
    Duration of Capacity Agreement Awarded
    15
    Delivery Years for which Agreement Valid
    2027/2028, 2028/2029, 2029/2030, 2030/2031, 2031/2032, 2032/2033, 2033/2034, 2034/2035, 2035/2036, 2036/2037, 2037/2038, 2038/2039, 2039/2040, 2040/2041, 2041/2042
    Latest Date SCM is expected to be achieved
    2027-09-30
    Subject to Substantial Completion Milestone
    Yes
    Subject to a Minimum Completion Requirement
    Yes
    Earliest Date SCM is expected to be achieved
    2025-03-31
    Legal Name of any Person with a Security Interest
    1.National Westminster Bank plc
    Duration of Capacity Agreement in First Bidding Round
    15
    Long-Stop Date for the Minimum Completion Requirement
    2028-10-01
    Auction Participation History
    2027-28T-42027-28 (T-4) Four Year Ahead Capacity Auction
    169.83 MW Prequalified
    Component ID: 277296
    Capacity: 169.83 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 664 767
    • Location and Post Code: land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Reciprocating engines
    • Description of CMU Components: Gas reciprocating engines
    CMU SEL126
    95.18 THURROCK POWER LIMITED
    Prequalified
  • ✓ Prequalified
  • 2026-27
    Capacity Information
    De-Rated Capacity
    95.18
    Connection/DSR Capacity
    100
    Anticipated Capacity
    95.18
    Max Obligation Period
    15
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    New Build Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Statera Energy Limited
    Registered Holder
    THURROCK POWER LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2026-SEL126-001
    Agreement Term
    15
    _id
    14026
    CMU ID
    SEL126
    Auction
    Capacity Auction
    Auction Name
    2026-27 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Thurrock Power Limited
    Name of Applicant
    THURROCK POWER LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    Nature of the Security Interest
    1.By charges and assignments contained in a debenture dated 31 October 2024
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    Date of Issue of Capacity Agreement
    2023-03-31
    Auction Acquired Capacity Obligation
    95.18
    Secondary Trading Contact - Telephone
    '+4402071860586
    Duration of Capacity Agreement Awarded
    15
    Delivery Years for which Agreement Valid
    2026/2027, 2027/2028, 2028/2029, 2029/2030, 2030/2031, 2031/2032, 2032/2033, 2033/2034, 2034/2035, 2035/2036, 2036/2037, 2037/2038, 2038/2039, 2039/2040, 2040/2041
    Latest Date SCM is expected to be achieved
    2026-09-30
    Subject to Substantial Completion Milestone
    Yes
    Subject to a Minimum Completion Requirement
    Yes
    Earliest Date SCM is expected to be achieved
    2024-03-31
    Legal Name of any Person with a Security Interest
    1.National Westminster Bank plc
    Duration of Capacity Agreement in First Bidding Round
    15
    Long-Stop Date for the Minimum Completion Requirement
    2027-10-01
    Auction Participation History
    2026-27T-42026-27 (T-4) Four Year Ahead Capacity Auction
    95.18 MW Prequalified
    Component ID: 291457
    Capacity: 95.18 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 661 768
    • Location and Post Code: land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.
    • Generating Technology Class: Reciprocating engines
    • Description of CMU Components: Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a gas power facility on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
    CMU SEL125
    314.094 THURROCK FLEXIBLE GENERATION …
    Prequalified
  • ✓ Not Prequalified
  • 2026-27
    Capacity Information
    De-Rated Capacity
    314.094
    Connection/DSR Capacity
    330
    Anticipated Capacity
    314.094
    Max Obligation Period
    15
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    New Build Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Company Name
    N/A
    Parent Company
    Statera Energy Limited
    Opt Out Status
    Opt-In
    Agreement Details
    _id
    14025
    CMU ID
    SEL125
    Auction
    Capacity Auction
    Auction Name
    2026-27 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Thurrock Power Limited
    Name of Applicant
    THURROCK FLEXIBLE GENERATION LIMITED
    Pre-Qualification Decision
    Not Prequalified
    Transmission / Distribution
    Transmission
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+4402071860586
    Auction Participation History
    2026-27T-42026-27 (T-4) Four Year Ahead Capacity Auction
    314.09 MW Not Prequalified
    Component ID: 292012
    Capacity: 314.09 MW
    Status: Not Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 663 766
    • Location and Post Code: land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a gas power facility on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
    CMU SEL127
    35.445 THURROCK STORAGE LIMITED
    Prequalified
  • ✓ Prequalified
  • 2026-27
    Capacity Information
    De-Rated Capacity
    35.445
    Connection/DSR Capacity
    150
    Anticipated Capacity
    35.445
    Max Obligation Period
    15
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Storage - Battery
    Category
    New Build Generating CMU
    Storage Facility
    Yes
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Statera Energy Limited
    Registered Holder
    THURROCK STORAGE LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2026-SEL127-001
    Agreement Term
    15
    _id
    14027
    CMU ID
    SEL127
    Auction
    Capacity Auction
    Auction Name
    2026-27 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Thurrock Power Limited
    Name of Applicant
    THURROCK STORAGE LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    Nature of the Security Interest
    1.By charges and assignments contained in a debenture dated 20 November 2023 and made between the Registered Holder and the Security Interest Beneficiary (the "Debenture"), the Registered Holder charged or otherwise secured in favour of the Security Interest Beneficiary, among other things: (a) by way of assignment, all of its present and future righ
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2023-03-31
    Auction Acquired Capacity Obligation
    35.445
    Secondary Trading Contact - Telephone
    '+4402071860586
    Duration of Capacity Agreement Awarded
    15
    Delivery Years for which Agreement Valid
    2026/2027, 2027/2028, 2028/2029, 2029/2030, 2030/2031, 2031/2032, 2032/2033, 2033/2034, 2034/2035, 2035/2036, 2036/2037, 2037/2038, 2038/2039, 2039/2040, 2040/2041
    Latest Date SCM is expected to be achieved
    2026-09-30
    Subject to Substantial Completion Milestone
    Yes
    Subject to a Minimum Completion Requirement
    Yes
    Earliest Date SCM is expected to be achieved
    2024-07-26
    Legal Name of any Person with a Security Interest
    1.National Westminster Bank plc
    Duration of Capacity Agreement in First Bidding Round
    15
    Long-Stop Date for the Minimum Completion Requirement
    2027-10-01
    Auction Participation History
    2026-27T-42026-27 (T-4) Four Year Ahead Capacity Auction
    35.45 MW Prequalified
    Component ID: 184985
    Capacity: 35.45 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 664 769
    • Location and Post Code: land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.
    • Generating Technology Class: Storage (Duration 2h)
    • Description of CMU Components: Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
    CMU SEL128
    161.806 THURROCK POWER LIMITED
    Prequalified
  • ✓ Prequalified
  • 2026-27
    Capacity Information
    De-Rated Capacity
    161.806
    Connection/DSR Capacity
    170
    Anticipated Capacity
    161.806
    Max Obligation Period
    15
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    New Build Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Statera Energy Limited
    Registered Holder
    THURROCK POWER LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2026-SEL128-001
    Agreement Term
    15
    _id
    14028
    CMU ID
    SEL128
    Auction
    Capacity Auction
    Auction Name
    2026-27 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Thurrock Power Limited
    Name of Applicant
    THURROCK POWER LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    Nature of the Security Interest
    1.By charges and assignments contained in a debenture dated 31 October 2024
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2023-03-31
    Auction Acquired Capacity Obligation
    161.806
    Secondary Trading Contact - Telephone
    '+4402071860586
    Duration of Capacity Agreement Awarded
    15
    Delivery Years for which Agreement Valid
    2026/2027, 2027/2028, 2028/2029, 2029/2030, 2030/2031, 2031/2032, 2032/2033, 2033/2034, 2034/2035, 2035/2036, 2036/2037, 2037/2038, 2038/2039, 2039/2040, 2040/2041
    Latest Date SCM is expected to be achieved
    2026-09-30
    Subject to Substantial Completion Milestone
    Yes
    Subject to a Minimum Completion Requirement
    Yes
    Earliest Date SCM is expected to be achieved
    2024-03-31
    Legal Name of any Person with a Security Interest
    1.National Westminster Bank plc
    Duration of Capacity Agreement in First Bidding Round
    15
    Long-Stop Date for the Minimum Completion Requirement
    2027-10-01
    Auction Participation History
    2026-27T-42026-27 (T-4) Four Year Ahead Capacity Auction
    161.81 MW Prequalified
    Component ID: 220450
    Capacity: 161.81 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 661 766
    • Location and Post Code: land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.
    • Generating Technology Class: Reciprocating engines
    • Description of CMU Components: Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a gas power facility on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
    CMU SEL145
    40.725 THURROCK STORAGE LIMITED
    Prequalified
  • ✓ Prequalified
  • 2025-26
    Capacity Information
    De-Rated Capacity
    40.725
    Connection/DSR Capacity
    150
    Anticipated Capacity
    40.725
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Storage - Battery
    Category
    New Build Generating CMU
    Storage Facility
    Yes
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Statera Energy Limited
    Registered Holder
    THURROCK STORAGE LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2025-SEL145-001
    Agreement Term
    1
    _id
    12285
    CMU ID
    SEL145
    Auction
    Capacity Auction
    Auction Name
    2025-26 (T-1) One Year Ahead Capacity Auction
    CM Unit Name
    Thurrock Storage Limited
    Name of Applicant
    THURROCK STORAGE LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2025-03-31
    Auction Acquired Capacity Obligation
    40.725
    Secondary Trading Contact - Telephone
    '+4402071860586
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2025/2026
    Latest Date SCM is expected to be achieved
    2026-09-30
    Subject to Substantial Completion Milestone
    Yes
    Subject to a Minimum Completion Requirement
    Yes
    Earliest Date SCM is expected to be achieved
    2024-07-26
    Duration of Capacity Agreement in First Bidding Round
    1
    Long-Stop Date for the Minimum Completion Requirement
    2025-10-01
    Auction Participation History
    2025-26T-12025-26 (T-1) One Year Ahead Capacity Auction
    40.73 MW Prequalified
    Component ID: 531094
    Capacity: 40.73 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 664 769
    • Location and Post Code: land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.
    • Primary Fuel of Component: Storage - Battery
    • Generating Technology Class: Storage (Duration 2h)
    • Description of CMU Components: Battery Storage plant
    Welcome to Capacity Market Search
    🗺️ 1 week free trial to explore all features!

    You can explore the basic features, but will need to register for continued access to premium features like the interactive map.

    Choose your contribution amount
    Unlimited access to all premium features

    Secure payment • No subscription • Lifetime access