Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Search / All Locations / All Postcodes / TN24 / TN24 0GP

The Long Barrow, Willesborough, Ashford, Kent. TN24 0GP

9.52 MW (CMU 22PR03)
Total Capacity
TN24 0GP
Postcode
14
Components
Active*
2026-27
Prequalified
Prequalification (2026)
Existing Generating CMU New Build Generating CMU Refurbishing Generating CMU
* Latest auction year on record
Companies:
UK POWER RESERVE LIMITED Active 2026 13 components
UK Capacity Reserve Ltd Historical 2017 1 component
Descriptions:
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
β€’ The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Trading Contacts:
UK Capacity Reserve Ltd
UK POWER RESERVE LIMITED

CMU Registry Data

CMU 22PR03
9.518 UK POWER RESERVE …
Existing Generating CMU 2026-27
CMU 21PR03
9.373 UK POWER RESERVE …
Existing Generating CMU 2025-26
CMU 20PR03
9.522 UK POWER RESERVE …
Existing Generating CMU 2024-25
CMU 19PR03
9.498 UK POWER RESERVE …
Existing Generating CMU 2023-24
CMU T3PR03
9.498 UK POWER RESERVE …
Existing Generating CMU 2022-23
CMU 18PR03
UK POWER RESERVE …
Refurbishing Generating CMU 2022-23
CMU 17PR03
UK POWER RESERVE …
Refurbishing Generating CMU 2021-22
CMU 16PR03
9.417 UK POWER RESERVE …
Existing Generating CMU 2020-21
CMU 16CR84
4.332 UK Capacity Reserve …
New Build Generating CMU 2017-18