Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help
Capacity Market Search
Menu
Home
  • Technologies
  • Companies
  • Locations
  • Map Explorer
  • FAQ
  • Trading Board
  • ChatGPT

  • Buy Me A Coffee
  • Help

  • Login
  • Register

  • Theme
  • Light
  • Dark
  • Auto
  • Understanding AuctionsSearch ResultsComponent GroupingSortingMap ViewContact Us

    Search Guide

    This registry provides comprehensive search capabilities across all Capacity Market components:

    • Company Search: Enter a company name (e.g., "Drax", "EDF") to see all their components
    • Location Search: Search by city, region, or postcode (e.g., "Manchester", "SW1")
    • CMU ID Search: Enter a specific CMU ID to find exact components
    • Technology Search: Enter technology types like "Hydro", "OCGT", or "Battery"

    The search is intelligent and will try to determine what you're looking for based on your query.

    You can combine search terms to narrow results, such as "London Battery" to find battery storage in London.

    Searches are not case-sensitive, and partial matches are supported (e.g., "Manch" will find "Manchester").

    Understanding Auctions

    The Capacity Market runs regular auctions where providers compete to secure agreements. There are two main types:

    • T-4 auctions: Held 4 years ahead of the delivery year
    • T-1 auctions: Held 1 year ahead to fine-tune capacity requirements

    Each auction results in agreements that specify how much capacity providers must deliver and the payment they'll receive.

    Auction years are displayed as badges (e.g., 2023-24) that you can click to view details for that specific auction year.

    The Capacity Market ensures the UK has sufficient electricity supply during periods of high demand or system stress.

    Providers receive payments for ensuring their capacity is available, creating a more stable and resilient electricity market.

    Search Results

    Search results are grouped by location and show important details about each component:

    • Active Components with auction years 2024-25 or later
    • In-Active Components with only auction years before 2024-25
    • Company Name Click to view all components for this company
    • Technology Click to search for this technology type
    • CMU: XXX Click to search for this CMU ID
    • Auction Year Click to view details for this specific auction

    Each result shows the component's capacity, location details, and participation in specific auction years.

    You can sort results by relevance, location, or date using the sort options.

    Pagination controls appear at the bottom when there are multiple pages of results.

    Component Grouping

    Components at the same location with the same description are grouped together to reduce duplication.

    Each group shows:

    • All CMU IDs for components at that location
    • All auction years, sorted with newest first
    • An Active/Inactive status based on auction years

    Grouping helps identify multi-year contracts and related components at the same site.

    The total capacity shown combines all components in the group.

    Components can be expanded to show individual details by clicking the expand icon.

    Sorting and Filtering

    You can sort search results by:

    • Relevance: Most relevant matches first
    • Location: Alphabetical order by location name
    • Date: By auction year (newest or oldest first)
    • Capacity: Highest or lowest capacity first

    Click the column headers to change sort order.

    You can filter results using the search refinements at the top of the results page:

    • Filter by technology type (e.g., only show batteries)
    • Filter by active status (show only active or inactive components)
    • Filter by auction year (show only components from specific auctions)

    Map Explorer & Map View

    We provide two map-based tools for exploring capacity market data:

    Map Explorer

    The Map Explorer is our advanced interactive mapping tool, specifically designed for comprehensive data exploration with:

    • Mobile-Optimized Interface: Responsive design that works perfectly on phones and tablets
    • Advanced Filtering: Filter by technology type, company, delivery year, and active status
    • Smart Sidebar: Desktop users get a dedicated filter panel, mobile users get collapsible filters
    • Full-Screen Map: Maximizes map space for detailed geographical analysis
    Search Map View

    The Search Map View combines search functionality with map visualization, offering:

    • Search-First Approach: Start with text searches, then visualize results on the map
    • Integrated Results: Search results and map display work together
    • Performance Optimized: Streamlined for fast search result mapping

    Both tools provide a visual representation of capacity distribution across the UK, but serve different exploration needs.

    Map Features:
    • Technology Colors: Different technology types are shown with distinct colors on the map for easy identification:
      GasDSRNuclearCHPSolarWind
      BatteryBiomassHydroInterconnectorCoalOther
    • Technology Legend: The map legend shows all available technologies with their corresponding colors and component counts
    • Search Results on Map: You can view any search results on the map by clicking "View on Map" from search results pages
    • Smart Clustering: Areas with multiple components are automatically grouped into clusters - click clusters to zoom in and see individual components
    • Interactive Markers: Click on individual markers to see detailed information about components at that location

    Use the map controls to zoom in on specific regions or areas of interest. The map automatically adjusts clustering based on your zoom level to provide the clearest view of capacity distribution.

    Contact Us

    We're here to help with any questions about the Capacity Market Registry.

    Email

    For general inquiries and support:

    For LLMs

    Complete programmatic access guide for LLMs:

    Search / All Locations / All Postcodes / TS90 / TS90 8WS

    Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS

    58.48 MW
    Total Capacity
    TS90 8WS
    Postcode
    23
    Components
    Prequalified
    Prequalification
    * Latest auction year on record
    Descriptions:
    • (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
    • (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT and Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
    • S23G03 will be a OCGT in CHP Configuration within the (former ICI) Wilton Site. CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1.
    Auction Status:
    Active2028-29
    Other Locations at This Postcode 1 location
    Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom 38.65 MW
    Storage (Duration 2h) Sembcorp Utilities (UK) Limited14 components
    Secondary Trading Contacts
    Sembcorp Utilities (UK) Limited:
    Sembcorp Utilities (UK) Limited:

    CMU Registry Data

    CMU S28G1S
    58.475 Sembcorp Utilities (UK) …
    Rejected
  • ✗ Rejected
  • 2028-29
    Capacity Information
    De-Rated Capacity
    58.475
    Connection/DSR Capacity
    64.294
    Anticipated Capacity
    58.475
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Company Name
    N/A
    Parent Company
    SEMBCORP ENERGY UK LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    _id
    15929
    CMU ID
    S28G1S
    Auction
    Capacity Auction
    Auction Name
    2028-29 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Sembcorp Wilton GT1 and ST11
    Name of Applicant
    Sembcorp Utilities (UK) Limited
    Pre-Qualification Decision
    Rejected
    Transmission / Distribution
    Transmission
    Secondary Trading Contact - Email
    Secondary Trading Contact - Telephone
    '+441642212665
    Auction Participation History
    2028-29T-42028-29 (T-4) Four Year Ahead Capacity Auction
    58.48 MW Rejected
    Component ID: 534828
    Capacity: 58.48 MW
    Status: Rejected
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NZ 568 218
    • Location and Post Code: Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT and Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
    CMU S27G1S
    61.709 Sembcorp Utilities (UK) …
    Prequalified
  • ✓ Prequalified
  • 2027-28
    Capacity Information
    De-Rated Capacity
    61.709
    Connection/DSR Capacity
    67.375
    Anticipated Capacity
    62.038
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    SEMBCORP ENERGY UK LIMITED
    Registered Holder
    Sembcorp Utilities (UK) Limited
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2027-S27G1S-001
    Agreement Term
    1
    _id
    14856
    CMU ID
    S27G1S
    Auction
    Capacity Auction
    Auction Name
    2027-28 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Sembcorp Wilton GT1 and ST11
    Name of Applicant
    Sembcorp Utilities (UK) Limited
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    Date of Issue of Capacity Agreement
    2024-04-08
    Auction Acquired Capacity Obligation
    61.709
    Secondary Trading Contact - Telephone
    '+441642212665
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2027/2028
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2027-28T-42027-28 (T-4) Four Year Ahead Capacity Auction
    61.71 MW Prequalified
    Component ID: 140715
    Capacity: 61.71 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NZ 568 218
    • Location and Post Code: Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT and Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
    CMU S26G1S
    64.246 Sembcorp Utilities (UK) …
    Prequalified
  • ✓ Prequalified
  • 2026-27
    Capacity Information
    De-Rated Capacity
    64.246
    Connection/DSR Capacity
    70.337
    Anticipated Capacity
    64.247
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    SEMBCORP ENERGY UK LIMITED
    Registered Holder
    Sembcorp Utilities (UK) Limited
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2026-S26G1S-001
    Agreement Term
    1
    _id
    14008
    CMU ID
    S26G1S
    Auction
    Capacity Auction
    Auction Name
    2026-27 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Sembcorp Wilton GT1 and ST11
    Name of Applicant
    Sembcorp Utilities (UK) Limited
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2023-03-31
    Auction Acquired Capacity Obligation
    64.246
    Secondary Trading Contact - Telephone
    '+441642212665
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2026/2027
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2026-27T-42026-27 (T-4) Four Year Ahead Capacity Auction
    64.25 MW Prequalified
    Component ID: 291497
    Capacity: 64.25 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NZ 568 218
    • Location and Post Code: Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT and Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
    CMU S25G1S
    63.951 Sembcorp Utilities (UK) …
    Prequalified
  • ✓ Prequalified
  • 2025-26
    Capacity Information
    De-Rated Capacity
    63.951
    Connection/DSR Capacity
    70.338
    Anticipated Capacity
    63.951
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    SEMBCORP ENERGY UK LIMITED
    Registered Holder
    Sembcorp Utilities (UK) Limited
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2025-S25G1S-001
    Agreement Term
    1
    _id
    13148
    CMU ID
    S25G1S
    Auction
    Capacity Auction
    Auction Name
    2025-26 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Sembcorp Wilton GT1 and ST11
    Name of Applicant
    Sembcorp Utilities (UK) Limited
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2022-04-01
    Auction Acquired Capacity Obligation
    63.951
    Secondary Trading Contact - Telephone
    '+441642212665
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2025/2026
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2025-26T-42025-26 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 366857
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NZ 568 218
    • Location and Post Code: Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT and Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
    CMU S24S11
    25.268 Sembcorp Utilities (UK) …
    Prequalified
  • ✓ Prequalified
  • 2024-25
    Capacity Information
    De-Rated Capacity
    25.268
    Connection/DSR Capacity
    28.075
    Anticipated Capacity
    25.268
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    SEMBCORP ENERGY UK LIMITED
    Registered Holder
    Sembcorp Utilities (UK) Limited
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2024-S24S11-001
    Agreement Term
    1
    _id
    11676
    CMU ID
    S24S11
    Auction
    Capacity Auction
    Auction Name
    2024-25 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Sembcorp Wilton ST11
    Name of Applicant
    Sembcorp Utilities (UK) Limited
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2021-04-19
    Auction Acquired Capacity Obligation
    25.268
    Secondary Trading Contact - Telephone
    '+441642212665
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2024/2025
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2024-25T-42024-25 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 114186
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NZ 568 219
    • Location and Post Code: Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S24S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
    CMU S24G01
    37.8 Sembcorp Utilities (UK) …
    Prequalified
  • ✓ Prequalified
  • 2024-25
    Capacity Information
    De-Rated Capacity
    37.8
    Connection/DSR Capacity
    42
    Anticipated Capacity
    37.8
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    SEMBCORP ENERGY UK LIMITED
    Registered Holder
    Sembcorp Utilities (UK) Limited
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2024-S24G01-001
    Agreement Term
    1
    _id
    11674
    CMU ID
    S24G01
    Auction
    Capacity Auction
    Auction Name
    2024-25 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Sembcorp Wilton GT1
    Name of Applicant
    Sembcorp Utilities (UK) Limited
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2021-04-19
    Auction Acquired Capacity Obligation
    37.8
    Secondary Trading Contact - Telephone
    '+441642212665
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2024/2025
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2024-25T-42024-25 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 277630
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NZ 568 218
    • Location and Post Code: Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S24G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
    CMU S23S11
    19.828 Sembcorp Utilities (UK) …
    Prequalified
  • ✓ Prequalified
  • 2023-24
    Capacity Information
    De-Rated Capacity
    19.828
    Connection/DSR Capacity
    22.031
    Anticipated Capacity
    19.828
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    SEMBCORP ENERGY UK LIMITED
    Registered Holder
    Sembcorp Utilities (UK) Limited
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2023-S23S11-001
    Agreement Term
    1
    _id
    10169
    CMU ID
    S23S11
    Auction
    Capacity Auction
    Auction Name
    2023-24 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Sembcorp Wilton ST11
    Name of Applicant
    Sembcorp Utilities (UK) Limited
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2020-04-17
    Auction Acquired Capacity Obligation
    19.828
    Secondary Trading Contact - Telephone
    '+441642212665
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2023/2024
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 281010
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NZ 568 219
    • Location and Post Code: Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
    CMU S23G01
    37.8 Sembcorp Utilities (UK) …
    Prequalified
  • ✓ Prequalified
  • 2023-24
    Capacity Information
    De-Rated Capacity
    37.8
    Connection/DSR Capacity
    42
    Anticipated Capacity
    37.8
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    SEMBCORP ENERGY UK LIMITED
    Registered Holder
    Sembcorp Utilities (UK) Limited
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2023-S23G01-001
    Agreement Term
    1
    _id
    10166
    CMU ID
    S23G01
    Auction
    Capacity Auction
    Auction Name
    2023-24 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Sembcorp Wilton GT1
    Name of Applicant
    Sembcorp Utilities (UK) Limited
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2020-04-17
    Auction Acquired Capacity Obligation
    37.8
    Secondary Trading Contact - Telephone
    '+441642212665
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2023/2024
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 282301
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NZ 568 218
    • Location and Post Code: Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
    CMU S23G03
    44.91 Sembcorp Utilities (UK) …
    Prequalified
  • ✓ Prequalified
  • 2023-24
    Capacity Information
    De-Rated Capacity
    44.91
    Connection/DSR Capacity
    49.9
    Anticipated Capacity
    44.91
    Max Obligation Period
    15
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    New Build Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Company Name
    N/A
    Parent Company
    SEMBCORP ENERGY UK LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    No
    _id
    10168
    CMU ID
    S23G03
    Auction
    Capacity Auction
    Auction Name
    2023-24 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Sembcorp Wilton GT3
    Name of Applicant
    Sembcorp Utilities (UK) Limited
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    New Build Yet to Satisfy FCM
    Yes
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+441642212665
    Duration of Capacity Agreement in First Bidding Round
    15
    Auction Participation History
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 150019
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NZ 574 209
    • Location and Post Code: Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: S23G03 will be a OCGT in CHP Configuration within the (former ICI) Wilton Site. CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1.
    CMU S22ST1
    19.828 Sembcorp Utilities (UK) …
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    19.828
    Connection/DSR Capacity
    22.031
    Anticipated Capacity
    19.828
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    SEMBCORP ENERGY UK LIMITED
    Registered Holder
    Sembcorp Utilities (UK) Limited
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2022-S22ST1-001
    Agreement Term
    1
    _id
    7550
    CMU ID
    S22ST1
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-3) Three Year Ahead Capacity Auction
    CM Unit Name
    Sembcorp Wilton ST11
    Name of Applicant
    Sembcorp Utilities (UK) Limited
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2020-03-11
    Auction Acquired Capacity Obligation
    19.828
    Secondary Trading Contact - Telephone
    '+441642212665
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2022/2023
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    Prequalified
    Component ID: 63402
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NZ 568 219
    • Location and Post Code: Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S22ST1 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
    CMU S22GT3
    44.91 Sembcorp Utilities (UK) …
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    44.91
    Connection/DSR Capacity
    49.9
    Anticipated Capacity
    44.91
    Max Obligation Period
    15
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    New Build Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Company Name
    N/A
    Parent Company
    SEMBCORP ENERGY UK LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    No
    _id
    7549
    CMU ID
    S22GT3
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-3) Three Year Ahead Capacity Auction
    CM Unit Name
    Sembcorp Wilton GT3
    Name of Applicant
    Sembcorp Utilities (UK) Limited
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    New Build Yet to Satisfy FCM
    Yes
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+441642212665
    Duration of Capacity Agreement in First Bidding Round
    15
    Auction Participation History
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    Prequalified
    Component ID: 277957
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NZ 574 209
    • Location and Post Code: Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: S22GT3 will be a OCGT in CHP Configuration within the (former ICI) Wilton Site. CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1.
    CMU S22GT1
    37.8 Sembcorp Utilities (UK) …
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    37.8
    Connection/DSR Capacity
    42
    Anticipated Capacity
    37.8
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    SEMBCORP ENERGY UK LIMITED
    Registered Holder
    Sembcorp Utilities (UK) Limited
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2022-S22GT1-001
    Agreement Term
    1
    _id
    7547
    CMU ID
    S22GT1
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-3) Three Year Ahead Capacity Auction
    CM Unit Name
    Sembcorp Wilton GT1
    Name of Applicant
    Sembcorp Utilities (UK) Limited
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2020-03-11
    Auction Acquired Capacity Obligation
    37.8
    Secondary Trading Contact - Telephone
    '+441642212665
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2022/2023
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    Prequalified
    Component ID: 375799
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NZ 568 218
    • Location and Post Code: Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S22GT1 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
    CMU S22G01
    37.61 Sembcorp Utilities (UK) …
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    37.61
    Connection/DSR Capacity
    41.789
    Anticipated Capacity
    37.61
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Company Name
    N/A
    Parent Company
    SEMBCORP ENERGY UK LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    _id
    8613
    CMU ID
    S22G01
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Sembcorp Wilton GT1
    Name of Applicant
    Sembcorp Utilities (UK) Limited
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+441642212665
    Auction Participation History
    2022-23T-42022-23 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 281641
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NZ 568 218
    • Location and Post Code: Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S22G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
    CMU S22G03
    44.91 Sembcorp Utilities (UK) …
    Conditional
  • ⚠ Conditionally Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    44.91
    Connection/DSR Capacity
    49.9
    Anticipated Capacity
    44.91
    Max Obligation Period
    15
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    New Build Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Company Name
    N/A
    Parent Company
    SEMBCORP ENERGY UK LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    _id
    8615
    CMU ID
    S22G03
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Sembcorp Wilton GT3
    Name of Applicant
    Sembcorp Utilities (UK) Limited
    Pre-Qualification Decision
    Conditionally Prequalified
    Transmission / Distribution
    Transmission
    New Build Yet to Satisfy FCM
    Yes
    Planning Consents Conditions
    Yes
    CMU confirmed entry into Auction
    No
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+441642212665
    Auction Participation History
    2022-23T-42022-23 (T-4) Four Year Ahead Capacity Auction
    Conditionally Prequalified
    Component ID: 54764
    Status: Conditionally Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NZ 574 209
    • Location and Post Code: Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: S22G03 will be a OCGT in CHP Configuration within the (former ICI) Wilton Site. CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1.
    CMU S22S11
    19.828 Sembcorp Utilities (UK) …
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    19.828
    Connection/DSR Capacity
    22.031
    Anticipated Capacity
    19.828
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Company Name
    N/A
    Parent Company
    SEMBCORP ENERGY UK LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    _id
    8616
    CMU ID
    S22S11
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Sembcorp Wilton ST11
    Name of Applicant
    Sembcorp Utilities (UK) Limited
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+441642212665
    Auction Participation History
    2022-23T-42022-23 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 114873
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NZ 568 219
    • Location and Post Code: Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S22S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
    CMU S21G01
    37.61 Sembcorp Utilities (UK) …
    Prequalified
  • ✓ Prequalified
  • 2021-22
    Capacity Information
    De-Rated Capacity
    37.61
    Connection/DSR Capacity
    41.789
    Anticipated Capacity
    37.61
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    SEMBCORP ENERGY UK LIMITED
    Registered Holder
    Sembcorp Utilities (UK) Limited
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2021-S21G01-001
    Agreement Term
    1
    _id
    6078
    CMU ID
    S21G01
    Auction
    Capacity Auction
    Auction Name
    2021-22 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Sembcorp Wilton GT1
    Name of Applicant
    Sembcorp Utilities (UK) Limited
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2018-03-20
    Auction Acquired Capacity Obligation
    37.61
    Secondary Trading Contact - Telephone
    '+441642212665
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2021/2022
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2021-22T-42021-22 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 366256
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NZ 568 218
    • Location and Post Code: Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS
    • Generating Technology Class: CHP and autogeneration
    • Description of CMU Components: (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S21G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
    CMU S21S11
    19.828 Sembcorp Utilities (UK) …
    Prequalified
  • ✓ Prequalified
  • 2021-22
    Capacity Information
    De-Rated Capacity
    19.828
    Connection/DSR Capacity
    22.031
    Anticipated Capacity
    19.828
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    SEMBCORP ENERGY UK LIMITED
    Registered Holder
    Sembcorp Utilities (UK) Limited
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2021-S21S11-001
    Agreement Term
    1
    _id
    6080
    CMU ID
    S21S11
    Auction
    Capacity Auction
    Auction Name
    2021-22 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Sembcorp Wilton ST11
    Name of Applicant
    Sembcorp Utilities (UK) Limited
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2018-03-20
    Auction Acquired Capacity Obligation
    19.828
    Secondary Trading Contact - Telephone
    '+441642212665
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2021/2022
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2021-22T-42021-22 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 366599
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NZ 568 219
    • Location and Post Code: Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS
    • Generating Technology Class: CHP and autogeneration
    • Description of CMU Components: (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S21S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
    CMU S20S11
    21.738 Sembcorp Utilities (UK) …
    Prequalified
  • ✓ Prequalified
  • 2020-21
    Capacity Information
    De-Rated Capacity
    21.738
    Connection/DSR Capacity
    24.153
    Anticipated Capacity
    21.738
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Registered Holder
    Sembcorp Utilities (UK) Limited
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2020-S20S11-001
    Agreement Term
    1
    _id
    4471
    CMU ID
    S20S11
    Auction
    Capacity Auction
    Auction Name
    2020-21 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Sembcorp Wilton ST11
    Name of Applicant
    Sembcorp Utilities (UK) Limited
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Date of Issue of Capacity Agreement
    2017-01-20
    Auction Acquired Capacity Obligation
    21.738
    Secondary Trading Contact - Telephone
    '+441642212665
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2020/2021
    Auction Participation History
    2020-21T-42020-21 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 149910
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NZ 572 214
    • Location and Post Code: Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS
    • Description of CMU Components: (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S20S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
    CMU S20G01
    37.539 Sembcorp Utilities (UK) …
    Prequalified
  • ✓ Prequalified
  • 2020-21
    Capacity Information
    De-Rated Capacity
    37.539
    Connection/DSR Capacity
    41.71
    Anticipated Capacity
    37.539
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Registered Holder
    Sembcorp Utilities (UK) Limited
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2020-S20G01-001
    Agreement Term
    1
    _id
    4469
    CMU ID
    S20G01
    Auction
    Capacity Auction
    Auction Name
    2020-21 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Sembcorp Wilton GT1
    Name of Applicant
    Sembcorp Utilities (UK) Limited
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Date of Issue of Capacity Agreement
    2017-01-20
    Auction Acquired Capacity Obligation
    37.539
    Secondary Trading Contact - Telephone
    '+441642212665
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2020/2021
    Auction Participation History
    2020-21T-42020-21 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 114242
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NZ 572 214
    • Location and Post Code: Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS
    • Description of CMU Components: (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S20G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
    CMU S17G01
    37.539 Sembcorp Utilities (UK) …
    Prequalified
  • ✓ Prequalified
  • 2017-18
    Capacity Information
    De-Rated Capacity
    37.539
    Connection/DSR Capacity
    41.71
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Registered Holder
    Sembcorp Utilities (UK) Limited
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2017-S17G01-001
    Agreement Term
    1
    _id
    713
    CMU ID
    S17G01
    Auction
    Capacity Auction
    Auction Name
    2017-18 (T-1) One Year Ahead Capacity Auction
    CM Unit Name
    Sembcorp Wilton GT1
    Name of Applicant
    Sembcorp Utilities (UK) Limited
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Date of Issue of Capacity Agreement
    2017-02-15
    Auction Acquired Capacity Obligation
    37.539
    Secondary Trading Contact - Telephone
    '+441642212665
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2017/2018
    Auction Participation History
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 611257
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NZ 572 214
    • Location and Post Code: Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS
    • Description of CMU Components: (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 562499
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NZ 572 214
    • Location and Post Code: Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS
    • Description of CMU Components: (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
    CMU S17S11
    21.738 Sembcorp Utilities (UK) …
    Prequalified
  • ✓ Prequalified
  • 2017-18
    Capacity Information
    De-Rated Capacity
    21.738
    Connection/DSR Capacity
    24.153
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Registered Holder
    Sembcorp Utilities (UK) Limited
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2017-S17S11-001
    Agreement Term
    1
    _id
    715
    CMU ID
    S17S11
    Auction
    Capacity Auction
    Auction Name
    2017-18 (T-1) One Year Ahead Capacity Auction
    CM Unit Name
    Sembcorp Wilton ST11
    Name of Applicant
    Sembcorp Utilities (UK) Limited
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Date of Issue of Capacity Agreement
    2017-02-15
    Auction Acquired Capacity Obligation
    21.738
    Secondary Trading Contact - Telephone
    '+441642212665
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2017/2018
    Auction Participation History
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 542699
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NZ 572 214
    • Location and Post Code: Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS
    • Description of CMU Components: (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 591457
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NZ 572 214
    • Location and Post Code: Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS
    • Description of CMU Components: (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
    Welcome to Capacity Market Search
    🗺️ 1 week free trial to explore all features!

    You can explore the basic features, but will need to register for continued access to premium features like the interactive map.

    Choose your contribution amount
    Unlimited access to all premium features

    Secure payment • No subscription • Lifetime access