Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

595 unique locations (3144 components) - Page 1 of 24

Sort by: A-Z Components MW Date
1020 CENTRE PARK, WARRINGTON WA1 1QY (3 components)

16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
1020 SLUTCHERS LANE, WARRINGTON, WA1 1QL (3 components)

gas generation

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
112 Beddington Lane, Beddington CR0 4TB (6 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
1345 Govan Rd, Glasgow Metropolitan Area G51 4TF (5 components)
• 3 x 1.2MW gas CHP in a hospital environment.
• 3 x 1.2MW gas CHP with 2.2MW excess (only two run at any time)
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
150 Maylands Avenue, Hemel Hempstead, Hertfordshire, HP2 7DF (2 components)

Back up generator at a data centre

Inactive • 2018-19 (T-1)
2236 London Road, Glasgow, G32 8YF (3 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
24A Flightway Dunkeswell Honiton EX14 4LG (3 components)

New Build Generating CMU comprising of a battery storage asset

Inactive • 2021-22 (T-4), 2018-19 (T-1)
2 Leeds City Office Park, Leeds, LS11 5BD (6 components)
• Office site with behind the meter back-up generation
• Office site with behind the meter back-up generation.
DSR Veolia UK Limited Conditional LS11
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
2 Princes Way Solihull West Midlands B91 2ES (2 components)

Embedded diesel generator at Princes Way site

Inactive • 2018-19 (T-1)
350 Petre Street Sheffield S4 8LU (11 components)
• New build battery
• New build battery.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
35 Evelyn Street Surrey Quays London SE8 5RT (2 components)

A reciprocating gas engine CHP providing hot water to a local heating network

Inactive • 2021-22 (T-4), 2018-19 (T-1)
3 Opal Way, Stone ST15 0BQ, UK (5 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
43 Devon Street, London, SE15 1AL (9 components)
• Lithium ion battery storage at a material recycling facility in south east London.
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
501 Merlin Park, Burscough Industrial Estate, Ormskirk, L40 8JY (6 components)
• Gas and/or diesel reciprocating engines.
• New build power station comprised of multiple reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
5 Howick Place London SW1P 1WG (10 components)

The CMU component is an aggregation of turn-down and onsite generation

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
64 Newman Street, London W1T 3EF (2 components)

Battery/generator UPS

Inactive • 2018-19 (T-1)
6 Braham St Aldgate London E1 8EE (4 components)

Site with behind the meter diesel generation - offsetting site load and exporting surplus.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
88 Coventry Road Broughton Astley Leicester LE9 6QA (8 components)
• Gas and/or diesel reciprocating engines.
• New build power station comprised of multiple reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
975 Mollison Avenue EN3 7NN (2 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2018-19 (T-1)
A1085, Middlesbrough TS6 7HJ (5 components)
• Gas and/or diesel reciprocating engines.
• New build power station comprised of multiple reciprocating engines.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
A1(M), Letchworth Garden City, SG6 2ER (3 components)

New 20MW gas-fired facility, metered on the distrbution network boundary using a COP2 meter with no auxilliary load on site

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Academy Way, Dagenham, London, RM8 2BF (10 components)

A reciprocating gas engine CHP site providing hot water to a local district heating network.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
0.34 MW
ADM Milling Tilbury Flour Mill, Tilbury Docks, Tilbury, Essex,RM18 7JU (4 components)

Flour & semolina milling business

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 25 locations