All Locations
595 unique locations (3144 components) - Page 1 of 24
1020 CENTRE PARK, WARRINGTON WA1 1QY (3 components)
16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
1020 SLUTCHERS LANE, WARRINGTON, WA1 1QL (3 components)
gas generation
112 Beddington Lane, Beddington CR0 4TB (6 components)
The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
1345 Govan Rd, Glasgow Metropolitan Area G51 4TF (5 components)
150 Maylands Avenue, Hemel Hempstead, Hertfordshire, HP2 7DF (2 components)
Back up generator at a data centre
2236 London Road, Glasgow, G32 8YF (3 components)
New build power station comprised of multiple reciprocating engines.
24A Flightway Dunkeswell Honiton EX14 4LG (3 components)
New Build Generating CMU comprising of a battery storage asset
2 Leeds City Office Park, Leeds, LS11 5BD (6 components)
2 Princes Way Solihull West Midlands B91 2ES (2 components)
Embedded diesel generator at Princes Way site
350 Petre Street Sheffield S4 8LU (11 components)
35 Evelyn Street Surrey Quays London SE8 5RT (2 components)
A reciprocating gas engine CHP providing hot water to a local heating network
3 Opal Way, Stone ST15 0BQ, UK (5 components)
Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
43 Devon Street, London, SE15 1AL (9 components)
501 Merlin Park, Burscough Industrial Estate, Ormskirk, L40 8JY (6 components)
5 Howick Place London SW1P 1WG (10 components)
The CMU component is an aggregation of turn-down and onsite generation
5 Mile Drive, Northwick, GL56 9TR - Please see additional information note accompanying connection agreements. (2 components)
Reciprocating engines
6 Braham St Aldgate London E1 8EE (4 components)
Site with behind the meter diesel generation - offsetting site load and exporting surplus.
88 Coventry Road Broughton Astley Leicester LE9 6QA (8 components)
975 Mollison Avenue EN3 7NN (2 components)
The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
9 J3 Business park, Balby Carr Bank, Doncaster, DN4 8DE (7 components)
A new build gas fuelled generating station.
A1085, Middlesbrough TS6 7HJ (5 components)
A1(M), Letchworth Garden City, SG6 2ER (3 components)
New 20MW gas-fired facility, metered on the distrbution network boundary using a COP2 meter with no auxilliary load on site
Academy Way, Dagenham, London, RM8 2BF (10 components)
A reciprocating gas engine CHP site providing hot water to a local district heating network.
ADM Milling Tilbury Flour Mill, Tilbury Docks, Tilbury, Essex,RM18 7JU (4 components)
Flour & semolina milling business