Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

GSES 1 LIMITED

10 unique locations (47 components)

Breach Farm Caldwell Swadlincote Derbyshire DE12 6RJ (1 component)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 9.8 MW export capacity and an import capacity of 10MW.

Inactive • 2020-21 (T-4)
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT (5 components)
• 0.800MW of storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT
• Battery storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT with a nameplate capacity of 0.800 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.05 MW
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT. (4 components)

0.800MW of battery storage located at Wiltshire.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Cleveland Potash Ltd, Boulby Mine, Loftus, Saltburn TS13 4UZ (3 components)

Purpose Build Battery designed to be compliant in the FFR market.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon CV37 9RG (4 components)

0.400MW of battery storage located at Stratford-Upon-Avon.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land North of Clayhill, Westoning, MK45 5JD. (4 components)

1.200MW of battery storage located at Westoning.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Larport Farm Larport Lane Dormington Hereford HR1 4EP (9 components)

19.500 MW of battery storage located at Hereford.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (9 components)
• 19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP
• Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.55 MW
Lower Road, Brentwood, CM13 1BZ (2 components)
• Advanced battery energy storage system
• New Build Generation CMU, advanced battery energy storage system
Inactive • 2021-22 (T-4), 2019-20 (T-1)
Sunrise House Hulley Road Macclesfield Cheshire SK10 2LP (6 components)

20.000 MW of battery storage located at Macclesfield.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 10 locations