Basin Road South. Portslade. East Sussex. BN41 1WF (6 components)

Combined Cycle Gas Turbine plant

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
186.15 MW (Est from CMU)
(Estimated)
Centrica Barry Power Station, Sully Moors Rd, Sully, CF64 5RP. (18 components)

Centrica Barry Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
363.08 MW
(Estimated)
Deeside Power Station Weighbridge Road Zone 4, Deeside Industrial Park Deeside Flintshire CH5 2UL (9 components)
• Deeside CCGT Power Station.
• Deeside CCGT Power Station. Please note: The TEC deferral box has been ticked on the CMU Main Page. The text on the EMR Portal screen mentions Rule 3.6.3(b) and the commitment to secure TEC by 18 months before the Delivery Year. DEEP_1 is applying for the Supplementary Auction only and therefore this option has been used in relation to Rule 3.10A.2, where TEC is required by 6 months prior to the Delivery Year.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
370.02 MW
(Estimated)
Drakelow Power Station, Burton on Trent, DE15 9TZ (5 components)

The unit is a four on two air cooled CCGT utilizing Siemens Industrial Trent DLE aero-derivitive gas turbines. The plant will be located at Drakelow, South Derbyshire.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
175.50 MW (Est from CMU)
(Estimated)
Drax Power Station, Selby, YO8 8PH (1 component)

New Build Combined Cycle Gas Turbine plant to be installed on designated land at the Drax Power Station site

Inactive • 2023-24 (T-4)
No capacity data
(Estimated)
230.64 MW (Est from CMU)
(Estimated)
Kings Lynn Power Station Willows Business Park Saddlebow, Kings Lynn PE34 3RD (8 components)

A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station

Inactive • 2019-20 (T-1), 2018-19 (T-1)
547.88 MW
(Estimated)
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (12 components)
• Combined Cycle Gas Turbine plant
• New build Combined Cycle Gas Turbine plant
• New build Open Cycle Gas Turbine plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
1887.09 MW (Est from CMU)
(Estimated)
No capacity data
(Estimated)
Knottingley Power Limited Knottingley CCGT Power Station Common Lane Knottingley West Yorkshire WF11 8DA (6 components)
• Knottingley Unit 1 is a combined cycle gas turbine generating unit
• Knottingly Unit 2 is a combined cycle gas turbine generating unit
Inactive • 2021-22 (T-4), 2020-21 (T-4)
1117.80 MW (Est from CMU)
(Estimated)
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (8 components)
• Hythe Power Station - Auxiliary load behind boundary meter
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
No capacity data
(Estimated)
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (10 components)
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
55.09 MW (Est from CMU)
(Estimated)
Severn Power Station West Nash Road Newport NP18 2BZ (12 components)

Existing CCGT unit

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
434.35 MW (Est from CMU)
(Estimated)
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP (7 components)
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire. Metering of output is Net of auxillary load.
• Unit 2 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
720.00 MW (Est from CMU)