Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

117 unique locations (923 components) - Page 1 of 5

41.84 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire (1 component)

Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.

Active • 2027-28 (T-4)
14.23 MW
Wicks Farm, Ford Lane, Arundel, W. Sussex, BN18 0DF (1 component)

New-Build CHP Generating Unit at Berry Wicks Farm.

Active • 2028-29 (T-4)
1.26 MW
Warrington Hospital, Lovely Lane, Warrington, CheshireWA5 1QG (2 components)

1 x Natural Gas Fired CHP unit

Inactive • 2019-20 (T-1)
Warrington Hospital, Lovely Lane, Warrington, Cheshire WA5 1QG (2 components)

1 x Natural Gas Fired CHP unit

Inactive • 2019-20 (T-1)
UK WINDOWS & DOORS GROUP LIMITED, 6400 Severn Drive, Tewkesbury, GL20 8SF. (5 components)

Cummins HSK78 2,000 kW Gas Engine located at UK WINDOWS & DOORS GROUP LIMITED, 6400 Severn Drive, Tewkesbury, GL20 8SF.

Inactive • 2023-24 (T-1), 2022-23 (T-1)
3.26 MW
T&L Sugars Limited, Thames Refinery, Factory Road, Silvertown, London, United Kingdom, E16 2EW (36 components)
• No2 Steam turbine - Allen Steam Turbines/NG Model MB510 - 2009 - Nominal power rating 14500kWe
• No5 Gas Turbine - European Gas Turbines SGT200 'Tornado' - S765/01 1997 - Nominal power output 6000kWe
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
26.32 MW
The fields close to Chear Farm Bungalow, Ely Road, Chittering, Cambridge, CB25 9PN (2 components)
• FENGEN (CMU) is a load reduction asset using lighting and battery energy storage (BESS) for growing of vegetables on an industrial scale.
• FENGH2 (CMU) is a new build generating 06.000MW gas fired CHP plant.
Active • 2028-29 (T-4)
5.41 MW
The Billingham Synthetic Plant, Haverton Hill Road, Billingham, TS23 1PY (2 components)

A Turbo Altenator located at the Billingham Plant

Inactive • 2019-20 (T-1)
Stubbins Hall Lane Waltham Abbey Essex EN9 2EE (7 components)
• Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market purposes
• Two gas CHP engines 1.54MW. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2025-26 (T-1) ...
1.45 MW
Stoneywood Mill, Bucksbum, Aberdeen, AB21 9AB (1 component)

Generating Plant located at Stoneywood Mill, Bucksbum, Aberdeen, AB21 9AB

Inactive • 2021-22 (T-4)
Station Road, Chartham, Kent, CT4 7JA (1 component)

Generating Plant located at Station Road, Chartham, Kent, CT4 7JA

Inactive • 2021-22 (T-4)
Stanlow Manufacturing Complex, Ellesmere Port, Cheshire, CH65 4HB (6 components)
• 2 x On-site turbo alternators
• 6 x On-site turbo alternators
• Power Recovery Train
Inactive • 2019-20 (T-1)
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (11 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Speke Operations, Fleming Rd, Liverpool L24 9LN (7 components)
• 2 x gas turbines with a total rated gross power capacity of 6.830 MW and total net power capacity of 6.807
• Speke combined heat and power plant.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Southport and Formby District General Hospital Town Lane, Kew Southport Merseyside PR8 6PN (3 components)

1 x Gas reciprocating engines with a total rated gross power capacity of 1.008 MW

Inactive • 2022-23 (T-4), 2019-20 (T-1)
South Kensington Campus, London, SW7 2AZ (4 components)
• One of two, 4.5MW CHP engines at Imperial Collage London
• One of two, 4.5MW CHP engines located at Imperial College London
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Southampton General Hospital, Tremona Road, Southampton, SO16 6YD (3 components)

2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Solenis UK Industries Limited, Cleckheaton Road, Low Moor, Bradford, West Yorkshire, BD12 0JZ (8 components)
• CHP Tornado SGT-200 6.4MWh
• CHP Typhoon SGT-100 4.7MWh
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 25 locations