Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

851 unique locations (4194 components) - Page 1 of 35

YEWTREE HOUSE, CROXALL ROAD, ALREWAS, BURTON ON TRENT, STAFFORDSHIRE, DE13 7BA. (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-4)
YEWTREE HOUSE, CROXALL ROAD, ALREWAS, BURTON ON TRENT, STAFFORDSHIRE, DE13 7BA (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Yearsley - Portbury, Garonor Way Royal Portbury Dock, Portbury, Bristol BS20 7XT (13 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Wyelands RI, Lower Lydbrook, Gloucester, Gloucestershire, GL17 9PA (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-1)
Wyelands RI, Lower Lydbrook, Gloucester, Gloucestershire, GL17 9NU (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-1)
WYBERSLEY, Stockport, UK, SK6 8FA (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-1), 2022-23 (T-1)
Wrexham, Redwither Road, Wrexham, LL13 9RD (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
Wormald Green, Land North of Sunnyside Gardens, Harrogate HG3 3RX (7 components)

8MW Energy Storage facility located in Harrogate.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Worlds End, Forest Road, Hambledon, PO7 4QU (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-1)
Woodlands Centre, Composting Facility, Whitesmith, Lewes, East Sussex, BN8 6JD (10 components)

In- vessel composting facility. Heavy plant used to produce animal feed and garden compost that can be turned down for DSR.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
WOLVERHAMPTON BATTERY STORAGE, 34 COMMERCIAL ROAD, WOLVERHAMPTON, WEST MIDLANDS, WV1 3RD (5 components)

4MW of DSR

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Woburn Sands HL, WOBURN SANDS HL, Off Woburn Sands Road, Woburn Sands, MILTON KEYNES, MK17 8RR, (5 components)

The CMU Component reduces import demand by turning on back up generation.

DSR E.ON UK Plc Not Prequalified MK17
Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
0.81 MW
Wixoe BS, WIXOE BS, Off Church Terrace, Wixoe, HALSTEAD Essex, CO10 8UA, (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Winteringham STW, INTERINGHAM STW, Ermine Street, Winteringham, LINCOLN, DN15 0AA, (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Winkhurst Green, Ide Hill, Sevenoaks, TN14 6LD (7 components)

3 x 1.6MW POSGU (standby generation)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Windsor Road, Redditch, Worcestershire, B97 6EF (6 components)

The CMU is composed of two CHPs (ECOMAX® 15 NGS) with an electrical output capacity of 1.501 MWe each. The CMU will supply electricty on site to METTIS AEROSPACE LIMITED.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Wimbourne Bournemouth BH21 5EP (5 components)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (4 components)
• 1 MW of demand reduction
• 1MW of demand reduction
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Willows, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (4 components)
• 1000kW/1200kWh Lithium Ion Battery
• 1MW Lithium Ion Battery Storage unit
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
William Lee - Site 1, Callywhite Lane, Dronfield, S182XU (12 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Wichling Pumping Station, Syndal Bottom, Sittingbourne, ME9 0BL (5 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Whitton WTW, Whitton WTW, Thurleston Lane, IPSWICH, IP1 6TG, (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
WHITEFIELD ROAD, BREDBURY, STOCKPORT, CHESHIRE, SK6 2QP (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Whilton STW, Anglian Water WRC, Whilton Locks, Whilton, NORTHAMPTON, NN11 2NH (4 components)

The CMU Component reduces import demand by turning on back up generation.

DSR ADD Renewables Limited Not Prequalified NN11
Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Loading map...
Showing 25 locations