Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

9 unique locations (17 components)

Farnham Battery Storage, Wrecclesham Hill, Farnham, GU10 4JU (3 components)

A new build 20MW battery energy storage system

Inactive • 2023-24 (T-1)
14.81 MW
Land directly South to Coventry Substation, Parrotts Grove, AldermanCoventry, CV2 1NQ (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-1)
33.32 MW
Land north east of Bustleholm Substation, M6, Walsall, WS5 4SJ (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-1)
16.66 MW
Land on Jameston Farm, Dalry Ayrshire KA24 4EY (1 component)

Array of lithium ion batteries in a power generation environment, proving power to National Grid. Change of use of land from agricultural to new build generation.

Inactive • 2022-23 (T-4)
Mannington Depot, Mannington Depot Service Road Mannington Swindon SN5 8BA (2 components)

A Battery Energy Storage System.

Inactive • 2023-24 (T-1), 2022-23 (T-1)
10.29 MW
Plot 10 Dunnikier Business Park Midfield Drive Mitchelston Industrial Estate Kirkcaldy Fife KY1 3LW (2 components)

BATTERY STORAGE UNIT WITH 13.5 MWh energy supply and 20 MW power capacity

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Timsbury Manor, Romsey SO51 0NE (1 component)

Lithium ion battery operating as a power plant. Change of use from redundant quarry.

Inactive • 2022-23 (T-4)
Loading map...
Showing 9 locations