Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

94 unique locations (111 components) - Page 1 of 4

Sort by: A-Z Components MW Date
1020 Slutchers Lane, Centre Park, Warrington, WA1 1QL (9 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution …
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local …
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
44.72 MW
4 Dewar Close Segensworth West Fareham Hampshire PO15 5UB (2 components)

A recently completed power plant, with associated civil works, switchgear and electrical connection.

PEAK GEN POWER 13 LIMITED Balancing Reserve PO15
Inactive • 2017-18 (T-1)
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (19 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
37.74 MW
Abergele, LL22 0LF (0 components)
• This location is balancing reserve only by Statkraft and contains a balancing reserve unit using gas reciprocating engines technology.
• [BR_ONLY] This location is balancing reserve only by STATKRAFT MARKETS GMBH and contains 1 balancing reserve unit using gas reciprocating …
Inactive •
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (10 components)
• Battery storage plant
• Existing generating battery storage unit.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
12.28 MW
Ashton Old Road, Openshaw, Manchester M11 1AA (6 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
17.13 MW
Attune Energy, Ernsettle Lane, Plymouth, PL5 2TS (4 components)
• CMU Component is 500kVA reciprocating diesel engine.
• This CMU is a 20MW distrubution connected facility that has been operational since November 2016. It is metered on the …
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Aylesbury, Buckinghamshire, HP17 8NE (0 components)
• This location is balancing reserve only by Tesla and contains 2 balancing reserve units using batteries technology.
• [BR_ONLY] This location is balancing reserve only by TESLA MOTORS LIMITED and contains 2 balancing reserve units using batteries.
Batteries TESLA MOTORS LIMITED Balancing Reserve HP17
Inactive •
Barrow-in-Furness, LA13 (0 components)
Balancing Reserve LA1
Inactive •
Batleys Cash and Carry Talbot Road Fareham PO15 5RY (11 components)
• The CMU component is net of the auxiliary power required (2)
• A completed power plant, with associated civil works, switchgear and electrical connection.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
52.31 MW
Billingham, Stockton-on-Tees, TS23 4EX (0 components)
• This location is balancing reserve only by Statkraft and contains 2 balancing reserve units using gas reciprocating engines technology.
• [BR_ONLY] This location is balancing reserve only by STATKRAFT MARKETS GMBH and contains 2 balancing reserve units using gas reciprocating …
Inactive •
Blauegate Works, Stanley Way, Lathom, Skelmersdale, WN8 8EA (8 components)
• Total installed capacity is 6.6MW of gas reciprocating engines to be installed on designated land within a manufacturing compound at …
• Total installed capacity is 7,952kW OF gas reciprocating engines to be installed on designated land within a manufacturing compound at …
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Bolton, Greater Manchester, BL5 1BX (0 components)
• This location is balancing reserve only by Statkraft and contains a balancing reserve unit using gas reciprocating engines technology.
• [BR_ONLY] This location is balancing reserve only by STATKRAFT MARKETS GMBH and contains 1 balancing reserve unit using gas reciprocating …
Inactive •
Bracknell, Berkshire, RG42 5NG (0 components)
• This location is balancing reserve only by Peak Gen and contains a balancing reserve unit using diesel technology.
• [BR_ONLY] This location is balancing reserve only by PEAK GEN TOP CO LIMITED and contains 1 balancing reserve unit using …
Diesel PEAK GEN TOP CO LIMITED Balancing Reserve RG42
Inactive •
Bristol Avenue, Blackpool, FY2 0JF (6 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
18.87 MW
Building 2 Aldon Road Business Park, Poulton Le Fylde FY6 8JL (6 components)

New build gas generator

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Buntingford, Hertfordshire, SG9 (0 components)
Balancing Reserve SG9
Inactive •
Burning Ground Site Kingsnorth Works Industrial Estate Hoo Rochester ME3 9NZ (8 components)

New build battery

Roaring Hill Energy Storage Ltd Balancing Reserve Not Prequalified ME3
Inactive • 2020-21 (T-4)
Burnley, Lancashire, BB10 2DB (0 components)
• This location is balancing reserve only by Flexitricity and contains a balancing reserve unit using gas reciprocating engines technology.
• [BR_ONLY] This location is balancing reserve only by FLEXITRICITY LIMITED and contains 1 balancing reserve unit using gas reciprocating engines.
Inactive •
Bury, BL9 (0 components)
Balancing Reserve BL9
Inactive •
Cambridge, CB25 (0 components)
Balancing Reserve CB2
Inactive •
Centrica Barry Power Station, Sully Moors Rd, Sully, CF64 5RP. (10 components)

Centrica Barry Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (8 components)
• 48 MW Battery Energy Storage facility
• 49.5 MW Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
36.65 MW
Chemistry Lane, Interlinq Trade Park, Queensfery, Flintshire, CH5 2DW (6 components)
• 14 MW power plant comprising 7 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution …
• 14 MW power plant comprising of 7 x 2MW gas reciprocating engines. The power plant is connected to the local …
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
Chesterfield, Derbyshire, S445XQ (0 components)
• This location is balancing reserve only by Centrica and contains a balancing reserve unit using batteries technology.
• [BR_ONLY] This location is balancing reserve only by CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED and contains 1 balancing reserve unit …
Inactive •
Loading map...
Showing 25 locations