Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

11 unique locations (13 components)

24-25 Eastern Way, Bury St Edmunds, IP32 7AD (17 components)

CHP Unit

Active • 2025-26 (T-1), 2024-25 (T-4) ...
7.81 MW
301 Camberwell New Rd, Camberwell, London, SE5 0TF (11 components)
• 1.26MW Battery Storage located at Abellio Walworth depot
• Battery Storage and demand reduction located at Abellio Walworth bus depot
• Bus depot site
Active • 2027-28 (T-4), 2026-27 (T-4) ...
ASDA Depot Falkirk CDC, New Bankside, Abbots Wynd FK2 7XP (13 components)
• Load curtailment from refridgeration
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Batleys Cash and Carry Talbot Road Fareham PO15 5RY (11 components)
• The CMU component is net of the auxiliary power required (2)
• A completed power plant, with associated civil works, switchgear and electrical connection.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.45 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (10 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.45 MW
Hope Works, Hope Valley,, Derbyshire, S33 6RP (15 components)
• "Hope Construction LTD Hope Works, Hope Valley,, Derbyshire, S33 6RP The CMU Component reduces import demand by turning off equipment …
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2024-25 (T-1), 2023-24 (T-1) ...
Ketton Works, Stamford, PE9 3SX (6 components)

Hanson site - Is Load Reduction/ Turn Down

Active • 2024-25 (T-1), 2023-24 (T-4) ...
NP11 (4 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-4), 2024-25 (T-1)
0.12 MW
Padeswood Works, Chester Road, Mold, Flintshire, CH7 4HB (6 components)

Site is Load Reduction / DSR Turn Down

Active • 2024-25 (T-1), 2023-24 (T-4) ...
RG42 (9 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.04 MW
Ribblesdale Cement Works, West Bradford Road, Clitheroe, BB7 4QF (10 components)

Hanson 2 - DSR Turn Down/ Load Reduction

Active • 2024-25 (T-1), 2023-24 (T-4) ...
Loading map...
Showing 11 locations