All Locations

11 unique locations (13 components)

4 Dewar Close Segensworth West Fareham Hampshire PO15 5UB (2 components)

A recently completed power plant, with associated civil works, switchgear and electrical connection.

PEAK GEN POWER 13 LIMITED SFFR Balancing Reserve PO15
Inactive • 2017-18 (T-1)
No capacity data
Attune Energy, Ernsettle Lane, Plymouth, PL5 2TS (4 components)
• CMU Component is 500kVA reciprocating diesel engine.
• This CMU is a 20MW distrubution connected facility that has been operational since November 2016. It is metered on the distrbution boundary using a COP2 meter and had no auxilliary load on site.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
No capacity data
Centrica Barry Power Station, Sully Moors Rd, Sully, CF64 5RP. (10 components)

Centrica Barry Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
No capacity data
Darcy Business Park Llandarcy Neath SA10 6EJ (2 components)

A recently completed power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2017-18 (T-1)
0.00 MW
(Estimated)
Dunbar Works, Dunbar, East Lothian, EH42 1SL (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
0.00 MW
(Estimated)
Harts Farm Way Havant Hampshire PO9 1HS (4 components)
• A new power plant, with associated civil works, switchgear and electrical connection.
• Recently completed power plant, with associated civil works, switchgear and electrical connection.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
0.00 MW
(Estimated)
Kings Barn Farm, Kings Barn Lane, Steyning, West Sussex, BN44 3YR (5 components)
• 10 MW of demand reduction
• 9.6 MW storage battery unit
Inactive • 2019-20 (T-1), 2018-19 (T-1)
No capacity data
Land at Ernest Nunn Road, Stowmarket IP14 2AH (4 components)

CMU is a new 20MW facility, metered on the distrbution boundary using a COP2 meter with no auxilliary load on site.

Inactive • 2019-20 (T-1), 2018-19 (T-1)
No capacity data
Land East Of Edgemoor Titchsborough Hill Otterham Station Camelford Cornwall PL32 9XU (8 components)
• A new build diesel and/or gas dual fuel generating station consisting of 47 generator units of 440KW each
• An operational 20 MW diesel fuelled generating station with existing T-1 and T-4 CM Contracts.
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
No capacity data
Matford Park Yeoford Way Exeter EX2 8LB (2 components)

Construction of new 20MW power plant, with associated civil works, switchgear and electrical connection

PEAK GEN POWER 14 LIMITED SFFR Balancing Reserve EX2
Inactive • 2017-18 (T-1)
No capacity data
The Research Centre, Parc Stormy, Stormydown, Bridgend, CF33 4RS (3 components)

4MW BESS

Inactive • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
Loading map...
Showing 11 locations