Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

15994 unique locations (60592 components) - Page 2 of 640

Sort by: A-Z Components MW Date
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (5 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
• CMU consisting of multiple reciprocating engines and alternators
Active • 2024-25 (T-4), 2023-24 (T-4) ...
150 Maylands Ave, Hemel Hempstead Industrial Estate, Hemel Hempstead HP2 7DF (3 components)

3MW - 3,45MWh Battery Energy Storage System

DSR BRYT ENERGY LIMITED Not Prequalified HP2
Active • 2025-26 (T-4), 2022-23 (T-1)
150 Maylands Avenue, Hemel Hempstead, Hertfordshire, HP2 7DF (2 components)

Back up generator at a data centre

Inactive • 2018-19 (T-1)
150 Maylands Avenue, Hemel Hempstead, Herts, HP2 7DF (1 component)

DSR Component providing load turn down at a data centre

Inactive • 2021-22 (T-4)
15-17 Deer Park Rd, Moulton Park Industrial Estate, Northampton NN3 6RX, United Kingdom (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
160 Corporation Road, Newport, Gwent, NP19 0WF (11 components)
• 0.39MW Battery Storage located at Newport Bus depot
• Bus depot site
Active • 2027-28 (T-4), 2026-27 (T-4) ...
160 Ipswich Road, Stoke Holy Cross, Norwich NR14 8PQ, UK (3 components)
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each …
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each …
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
16-18 Stall Street, Bath, BA1 1QB (5 components)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
165 Fordhouse Lane Stirchley Birmingham B30 3AG (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Inactive • 2028-29 (T-4)
4.19 MW
167 - 600 Hollands Recycling, Bentley Road South, Darlaston, WS10 8LN (9 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
172-174 Rye Lane PeckhamLondon, London, SE15 4NB (10 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
173 High Street, Cheltenham, United Kingdom, GL50 1DF (6 components)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
174 - 601 Farnham Road, Upper Froyle, Alton, GU34 4JD (9 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
17 Oak Tree Road, Fen Drayton, Cambridge, CB24 4SS (3 components)

2 x gas fired CHP generators located at a horticultural site.

Active • 2028-29 (T-4), 2025-26 (T-1) ...
2.73 MW
17 Oaktree Road Fen Drayton Cambridge CB24 5SS (3 components)

Two gas CHP engines 1.42MW and 1.42MW. Primary fuel type = Natural Gas

Inactive • 2020-21 (T-4), 2017-18 (T-1)
17 SHANNON WAY, ASHCHURCH, TEWKESBURY, GL20 8ND (2 components)

The CMU ComponeThe CMU Component reduces import demand by turning off equipment and other non-essential loads.nt reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-4), 2020-21 (T-1)
195 Aylesone Rd, Leicester LE2 7QJ (24 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
197 Pollokshaws Road, Glasgow, G41 1PS (1 component)

The CMU will be a series of gas fired generators

Inactive • 2020-21 (T-4)
19 Howard Road, Park Farm Industrial Estate, Redditch, Worcestershire, B98 7SE (2 components)

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have an import capacity of 4000kVa and an export capacity …

Inactive • 2023-24 (T-4), 2022-23 (T-3)
1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (16 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
4.72 MW
1A Yardley Road Liverpool L33 7SS (1 component)

Energy storage system providing capacity market, dynamic FFR and other balancing services.

Inactive • 2021-22 (T-4)
1 Kirkhaw Lane Knottingley WF11 8RD (1 component)

20 MW Storage facility located at Knottingley.

Inactive • 2021-22 (T-4)
1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD (4 components)
• AN 8MW new build gas generating station..
• CMU FES003 which is an electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity …
• CMU FES26B which is an electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity …
Active • 2026-27 (T-4), 2024-25 (T-4)
7.14 MW
1 Loicher Ln, Sheffield S35 9XN, UK (1 component)

2MW 60 minute frequency response battery storage

Inactive • 2021-22 (T-4)
Loading map...
Showing 25 locations