Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

8838 unique locations (40560 components) - Page 3 of 354

Sort by: A-Z Components MW Date
3 Nairn Road, Deans Industrial Estate, Livingston, West Lothian, EH54 8AY (9 components)
• Newbuild gas generator
• Reciprocating engine (natural gas fuelled)
• gas generator
Active • 2026-27 (T-4), 2025-26 (T-1) ...
6.24 MW
40 Gardiner Road, Edinburgh, Midlothian, EH4 3RN (1 component)

New build power station comprised of multiple reciprocating engines.

Active • 2025-26 (T-4)
44-48 E Dock St, Dundee DD1 3JS (7 components)

Bus depot site

Active • 2027-28 (T-4), 2026-27 (T-4) ...
46 Station Road Stokesley Middlesbrough TS9 7AA (12 components)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
• Gas CHP engines in commercial horticultural usage with no auxilliary load
Active • 2027-28 (T-4), 2025-26 (T-4) ...
4.25 MW
47-53 Charterhouse Street, London, EC1M 6PB (21 components)
• A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled …
• A site with two reciprocating gas engine CHPs, providing hot water to a local district heating network as well as …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.66 MW
4 Chemistry Ln, Pentre, Deeside CH5 2DA, UK (4 components)

14MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
13.02 MW
4 Finway Road Hemel Hempstead HP2 7PT (16 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW

Active • 2027-28 (T-4), 2026-27 (T-4) ...
4.72 MW
4 FULLARTON DRIVE, GLASGOW EAST INVESTMENT PARK, GLASGOW, G32 8FA (3 components)

New CHP engine to be installed at 4 FULLARTON DRIVE, GLASGOW EAST INVESTMENT PARK, GLASGOW, G32 8FA

Active • 2025-26 (T-4), 2022-23 (T-1)
0.30 MW
530 London Road, Croydon, CR7 7YE (6 components)

Gas fired CHP unit

Active • 2024-25 (T-1), 2023-24 (T-1) ...
1.41 MW
5 BALENA CLOSE CREEKMOOR BH17 7DG (1 component)

CMU consisting of multiple gas reciprocating engines and alternators

Active • 2024-25 (T-4)
5 Greenock Rd, Inchinnan, Renfrew PA4 9PG (8 components)

Bus depot site

Active • 2027-28 (T-4), 2026-27 (T-4) ...
60-70 Reach Road Burwell CB25 0AH (3 components)
• 10MW of onshore wind generation
• 40MW of solar generation covering lower Portland Farm and land off Newnam Drove.
• 49.900MW storage installation
Active • 2024-25 (T-4)
62 Marlborough Road Lancing Business Park Lancing BN15 8UF (3 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4), 2022-23 (T-1)
66 Molesworth Street, London SE13 7EY (14 components)
• CHP plant
• Gas fired CHP unit
Active • 2024-25 (T-1), 2023-24 (T-1) ...
5.08 MW
7 COWLEY WAY CREWE CW1 6AE (5 components)

CMU consisting of multiple gas reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-1) ...
3.42 MW
7 Market Street, Manchester, M1 1WT (11 components)
• DSR Component providing load turn down at a retail store
• Import/Export metering with diesel generation at a retail store
Active • 2024-25 (T-4), 2023-24 (T-4) ...
84 Bridge St, Wednesbury WS10 0AN (1 component)

New build power station comprised of multiple reciprocating engines

Active • 2025-26 (T-4)
9A Parker Avenue Felixstowe Suffolk IP11 4BB (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4)
9 Handyside St, Kings Cross, London N1C 4BH (12 components)

Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.

Active • 2027-28 (T-4), 2025-26 (T-4) ...
3.52 MW
AB10 (1 component)

Domestic demand turn down

Active • 2024-25 (T-1)
0.04 MW
AB12 (7 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2024-25 (T-4) ...
0.04 MW
AB14 (1 component)

Domestic EV charger

Active • 2025-26 (T-1)
AB15 (8 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2024-25 (T-4) ...
0.12 MW
Loading map...
Showing 25 locations