Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

15994 unique locations (60592 components) - Page 3 of 640

Sort by: A-Z Components MW Date
1 Mallard Road, Peterborough, PE3 8YN (1 component)

"Planet Ice - UK 1 Mallard Road, Peterborough, PE3 8YN The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Inactive • 2017-18 (TR)
1 Maxwell Road, Woodston Industrial Estate, Peterborough PE2 7JB (5 components)
• This CMU is 10*2MW reciprocating engines using HVO.
• This CMU is 10*2MW reciprocating engines.
• This CMU is 6*2MW reciprocating engines.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
18.70 MW
1 Midland Road, London, NW1 1AT (2 components)

One GE Genbacher 612GS 2MWe CHP

Inactive • 2019-20 (T-1)
1 Midland Road, London, NW1 IAT (2 components)

One GE Genbacher 612GS 2MWe CHP engine and one Caterpillar C175-16 ACERT 2.4MWe diesel backup generator

Inactive • 2019-20 (T-1)
1 MW - Oakhill Farm, ST10 4JH (1 component)

1 MW diesel gensets

Inactive • 2020-21 (T-4)
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (8 components)

The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 …

Active • 2024-25 (T-4), 2023-24 (T-4) ...
1 Ratty's Lane, Hoddesdon, Hertfordshire, EN11 0RF (5 components)
• Combined Cycle Gas Turbine
• Combined Cycle Gas Turbine plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
650.29 MW
1 Ratty's Lane, Hoddesdon. Hertsfordshire. EN11 ORF (3 components)

Combined Cycle Gas Turbine

Inactive • 2020-21 (T-4), 2017-18 (T-1)
1 Rivington Rd, Preston Brook, Runcorn WA7 3DP, United Kingdom (7 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1 Thane Road West, Nottingham, NG2 3AA (73 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2024-25 (T-1), 2023-24 (T-1) ...
21.44 MW
1 To 17 Inclusive, Titan Drive, Peterborough, PE1 5XN (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Inactive • 2028-29 (T-4)
0.05 MW
1 Waterfront Avenue, Edinburgh, EH5 1SG (19 components)
• Office site with behind the meter back up generation
• Office site with behind the meter generation
• Office site with behind the meter generation.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
0.81 MW
20 Marine Esplanade, Leith Docks, EH6 7LU (1 component)

1X diesel generator with a gross capacity of 2.900MW

Active • 2025-26 (T-1)
20 Marine Esplanade, Leith Docks, Leith, EH6 7LU (1 component)

1x diesel generator with a total rated gross power capacity of 2.900 MW

Active • 2024-25 (T-1)
20 Wallace Way Hitchin SG4 0SE (1 component)

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Inactive • 2022-23 (T-4)
2236 London Road, Glasgow, G32 8YF (3 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
229 Lakeside Shopping Centre, West Thurrock, Grays, RM20 2ZQ (5 components)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
23 New Canal, Salisbury, SP1 2AA (6 components)

DSR component providing load turn down at a retail store

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
23 Whittle Road, Ferndale Industrial Estate, Wimborne, BH21 7PW (6 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.83 MW
24-25 Eastern Way, Bury St Edmunds, IP32 7AD (17 components)

CHP Unit

Active • 2025-26 (T-1), 2024-25 (T-4) ...
7.81 MW
24a Flightway Dunkeswell Honiton EX14 4LG (8 components)
• New Build CMU comprising of battery storage and associated plant
• New Build Generating CMU comprising of a battery storage asset
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 25 locations