Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "BL5"

24 unique locations (47 components)

Sort by: Relevance A-Z Components MW Date
BL5 (7 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.04 MW
Bolton, Greater Manchester, BL5 1BX

This location is balancing reserve only by Statkraft and contains a unit using gas reciprocating engines.

BR Only
BRANDFORTH GARDENS WESTHOUGHTON BOLTON LANCASHIRE BL5 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
0.01 MW
Gorsey Hey, Westhoughton, Bolton, Lancashire, BL5 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
No capacity data
(Estimated)
HIGHER DRAKE MEADOW WESTHOUGHTON BOLTON LANCASHIRE BL5 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.0080 MW
HULTON PARK, BOLTON, BL5 3JA (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
No capacity data
Land at Ditchers Farm, off Slack Lane, North of Westhougton, BL5 3ZN (1 component)

This is a new battery storage plant, based on of lithium ion cells to be installed in multiple ISO compliant battery containers.

Inactive • 2021-22 (T-4)
No capacity data
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (5 components)
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated land within a compound at Westhoughton
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Active • 2027-28 (T-4), 2026-27 (T-4) ...
6.93 MW
Land to the west of Slack Lane, West Houghton, Bolton, Greater Manchester, BL5 3LJ (3 components)

New Build CMU comprising of battery storage and associated plant

Inactive • 2028-29 (T-4), 2027-28 (T-4)
9.67 MW
Land West Of Slack Lane, Westhoughton, Bolton BL5 3LB (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Inactive • 2028-29 (T-4)
3.14 MW
Land West Of Slack Lane, Westhoughton, Bolton, BL5 3LB (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Inactive • 2028-29 (T-4)
6.28 MW
Long Lane, Westhoughton, Bolton, BL5 3QR (1 component)

Energy facility comprising of reciprocating engine sets.

Inactive • 2021-22 (T-4)
No capacity data
Long Lane, Westhoughton, Bolton, Lancashire BL5 3QR (4 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
No capacity data
Madison Gardens, Bolton, Lancashire, BL5 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
0.04 MW
Parkham Close Bolton Lancashire BL5 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.0080 MW
Redwood Bolton Lancashire BL5 (1 component)

EV charging at residential premises

Inactive • 2027-28 (T-4)
0.02 MW
Salford Road, Bolton, Greater Manchester BL5 1DG (1 component)

Energy facility comprising of reciprocating engine sets.

Inactive • 2021-22 (T-4)
No capacity data
Salford Road, Over Holton, Bolton, Lancashire BL5 1BW (5 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
No capacity data
SANDALWOOD WESTHOUGHTON BOLTON LANCASHIRE BL5 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.0080 MW
Slack Lane, Bolton, Greater Manchester, BL5 3LJ (3 components)

New Build CMU comprising of battery storage and associated plant

Inactive • 2028-29 (T-4), 2027-28 (T-4)
4.84 MW
Slack Lane, Westhoughton, BL5 3LB (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
2.13 MW
Slack Lane, Westhoughton, BL5 3QH (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
4.25 MW
Snydale Close Westhoughton BL5 (1 component)

EV charging at residential premises

Inactive • 2027-28 (T-4)
0.02 MW
Yard adjacent to Manchester Road, Westhoughton BL5 3QH (1 component)

Gas fired generating units

Inactive • 2021-22 (T-4)
No capacity data
Loading map...
Showing 24 locations