Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "BL5"

24 unique locations (65 components)

Sort by: Relevance A-Z Components MW Date
BL5 (17 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.16 MW
(De-rated)
BRANDFORTH GARDENS WESTHOUGHTON BOLTON LANCASHIRE BL5 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
0.0097 MW
(De-rated)
Gorsey Hey, Westhoughton, Bolton, Lancashire, BL5 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Inactive • 2025-26 (T-1)
No capacity data
(De-rated)
HIGHER DRAKE MEADOW WESTHOUGHTON BOLTON LANCASHIRE BL5 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.0084 MW
(De-rated)
HULTON PARK, BOLTON, BL5 3JA (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
No capacity data
(De-rated)
Land at Ditchers Farm, off Slack Lane, North of Westhougton, BL5 3ZN (1 component)

This is a new battery storage plant, based on of lithium ion cells to be installed in multiple ISO compliant battery containers.

Inactive • 2021-22 (T-4)
No capacity data
(De-rated)
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (5 components)
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated land within a compound at Westhoughton
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.02 MW
(De-rated)
Land to the west of Slack Lane, West Houghton, Bolton, Greater Manchester, BL5 3LJ (4 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4), 2027-28 (T-4)
17.85 MW
(De-rated)
Land West Of Slack Lane, Westhoughton, Bolton BL5 3LB (2 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
6.28 MW
(De-rated)
Land West Of Slack Lane, Westhoughton, Bolton, BL5 3LB (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Inactive • 2028-29 (T-4)
6.28 MW
(De-rated)
Long Lane, Westhoughton, Bolton, BL5 3QR (1 component)

Energy facility comprising of reciprocating engine sets.

Inactive • 2021-22 (T-4)
No capacity data
(De-rated)
Long Lane, Westhoughton, Bolton, Lancashire BL5 3QR (4 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
No capacity data
(De-rated)
Madison Gardens, Bolton, Lancashire, BL5 (1 component)

EV charging on residential premises

Inactive • 2026-27 (T-4)
0.04 MW
(De-rated)
Parkham Close Bolton Lancashire BL5 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.0084 MW
(De-rated)
Redwood Bolton Lancashire BL5 (1 component)

EV charging at residential premises

Inactive • 2027-28 (T-4)
0.02 MW
(De-rated)
Salford Road, Bolton, Greater Manchester BL5 1DG (1 component)

Energy facility comprising of reciprocating engine sets.

Inactive • 2021-22 (T-4)
No capacity data
(De-rated)
Salford Road, Over Holton, Bolton, Lancashire BL5 1BW (6 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
19.04 MW
(De-rated)
SANDALWOOD WESTHOUGHTON BOLTON LANCASHIRE BL5 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.0084 MW
(De-rated)
Slack Lane, Bolton, Greater Manchester, BL5 3LJ (4 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4), 2027-28 (T-4)
8.84 MW
(De-rated)
Slack Lane, Westhoughton, BL5 3LB (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Inactive • 2026-27 (T-4)
2.13 MW
(De-rated)
Slack Lane, Westhoughton, BL5 3QH (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Inactive • 2026-27 (T-4)
4.25 MW
(De-rated)
Snydale Close Westhoughton BL5 (1 component)

EV charging at residential premises

Inactive • 2027-28 (T-4)
0.02 MW
(De-rated)
No capacity data
(De-rated)
Loading map...
Showing 23 locations