Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "BS10 7SE"

13 unique locations (79 components)

Sort by: Relevance A-Z Components MW Date
Land Off Severn Road Hallen Bristol South Gloucestershire BS10 7SE (3 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
29.32 MW
(Estimated)
Plot A Land at Severn Road Avonmouth BS10 7SE (4 components)

10 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Avonmouth Energy Park

Active • 2024-25 (T-4), 2023-24 (T-4)
19.04 MW (Est from CMU)
(Estimated)
Plot B at Severn Road Avonmouth BS10 7SE (16 components)

Existing Generator Battery Energy Storage System

Active • 2025-26 (T-1), 2025-26 (T-4) ...
7.74 MW (Est from CMU)
(Estimated)
Plot B at Severn Road Avonmouth BS10 7SE (6 components)

10.000MW DSR

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
No capacity data
(Estimated)
Plot B Land at Severn Road Avonmouth BS10 7SE (1 component)

Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear

Inactive • 2023-24 (T-4)
No capacity data
(Estimated)
Plot C Land at Severn Road Avonmouth BS10 7SE (5 components)

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. …

Inactive • 2023-24 (T-4), 2022-23 (T-4)
25.50 MW (Est from CMU)
(Estimated)
Plot C, Land at Severn Road Avonmouth BS10 7SE (4 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

Active • 2027-28 (T-4), 2026-27 (T-4)
52.81 MW (Est from CMU)
(Estimated)
Severn Road, Avonmouth, BS10 7SE (1 component)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4)
No capacity data
(Estimated)
SEVERN ROAD, AVONMOUTH BS10 7SE (2 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Active • 2020-21 (T-4)
No capacity data
(Estimated)
Molesworth Street Citibank Data Centre South (85821) (5 components)

Existing gas powerd CHP autogeneration unit

Inactive • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
(Estimated)
TBA (29 components)

Unproven DSR Component

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
No capacity data
(Estimated)
Loading map...