Search Results for "BS10 7SE"

10 unique locations (33 components)

Sort by: Relevance A-Z Components MW Date
Land Off Severn Road Hallen Bristol South Gloucestershire BS10 7SE (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Inactive • 2028-29 (T-4)
14.66 MW
Plot A Land at Severn Road Avonmouth BS10 7SE (7 components)
• 10 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Avonmouth Energy Park
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Avonmouth Energy Park
• Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear
Active • 2025-26 (T-4), 2024-25 (T-4) ...
No capacity data
Plot B at Severn Road Avonmouth BS10 7SE (13 components)
• 10.000MW DSR
• New Build Battery Energy Storage Systems
• The CMU will be formed of multiple individual Batteries. This site is to include a 17MW Battery Energy Storage System (BESS) that can either operate as import or export at will. The 17MW connection is to be provided at 33KV by installing an underground cable with a metering circuit breaker located at the customer's site.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
1.36 MW
Plot B Land at Severn Road Avonmouth BS10 7SE (1 component)

Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear

Inactive • 2023-24 (T-4)
No capacity data
Plot C Land at Severn Road Avonmouth BS10 7SE (4 components)

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. …

Inactive • 2023-24 (T-4), 2022-23 (T-4)
No capacity data
Plot C, Land at Severn Road Avonmouth BS10 7SE (3 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

Active • 2027-28 (T-4), 2026-27 (T-4)
10.77 MW
Severn Road, Avonmouth, BS10 7SE (1 component)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4)
No capacity data
SEVERN ROAD, AVONMOUTH BS10 7SE (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
No capacity data