Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "CH65 1AF"

11 unique locations (62 components)

Sort by: Relevance A-Z Components MW Date
Cheshire Power Station (Formally known as 'Bridgewater Paper') North Road Ellesmere Port CH65 1AF (8 components)

New build 12 x 1.1 MW Reciprocating gas engines at Cheshire Power Station

Inactive • 2019-20 (T-1), 2018-19 (T-1)
No capacity data
(Estimated)
No capacity data
(Estimated)
Cheshire Power Station North Road Ellesmere Port Cheshire CH65 1AF (7 components)

CMU will be formed of multiple individual reciprocating gas engines.

Inactive • 2023-24 (T-1), 2023-24 (T-4) ...
57.11 MW (Est from CMU)
(Estimated)
Cheshire Power Station, North Road, Ellesmere Port, Cheshire, CH65 1AF (1 component)

CMU formed of multiple individual Reciprocating Engines

Active • 2024-25 (T-1)
18.84 MW
(Estimated)
Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF (15 components)

One (1) Open Cycle Gas Turbine MSID: 7382

Active • 2028-29 (T-4), 2025-26 (T-1) ...
249.14 MW (Est from CMU)
(Estimated)
42.07 MW
(Estimated)
No capacity data
(Estimated)
RWE Cogen UK Ltd North Road Ellesmere Port Cheshire CH65 1AF (6 components)

CMU will be formed of multiple individual gas reiprocating engine units

Inactive • 2017-18 (T-1)
No capacity data
(Estimated)
RWE Cogen UK Ltd North Road Ellesmere Port South Wirral CH65 1AF (1 component)

CMU will be formed of multiple individual gas reiprocating engine units

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
RWE Cogen UK Ltd North Road Ellesmere Port South Wirral CH65 1AF (11 components)

Cheshire OCGT - Currently no additional load on the Private Network - Auxiliary load behind boundary meter

Inactive • 2020-21 (T-4), 2017-18 (T-1)
No capacity data
(Estimated)
RWE Generation UK plc, Cheshire Power Station North Road, Ellesmere Port Cheshire CH65 1AF (2 components)

The CMU will be formed of multiple battery storage units and medium voltage stations (inverter and battery transformer) connected in parallel.

Active • 2026-27 (T-4), 2025-26 (T-4)
21.42 MW (Est from CMU)
(Estimated)
Loading map...