Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "COWLEY MEADOW WAY CRICK NORTHAMPTONSHIRE NN6"

1 unique locations (22 components)

COWLEY MEADOW WAY CRICK NORTHAMPTONSHIRE NN6 (22 components)

EV charging at residential premises

DSR EV Charging Part of VERDANT BIDCO 2 LIMITED COWLEY BALDON GREEN LIMITED NN6
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.88 MW
(Estimated)
Corringham, Stanford-le-Hope, Essex SS17 9LP UK (2 components)

A new combined cycle power station comprising the latest technology gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land …

Inactive • 2021-22 (T-4), 2020-21 (T-4)
1095.30 MW
(Estimated)
COWLEY GREEN WOMBWELL BARNSLEY S73 (12 components)

EV charging at residential premises

DSR EV Charging Part of VERDANT BIDCO 2 LIMITED COWLEY BALDON GREEN LIMITED S7
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.88 MW
(Estimated)
Cowley Hill Borehamwood Hertfordshire WD6 (12 components)

EV charging at residential premises

DSR EV Charging Part of VERDANT BIDCO 2 LIMITED COWLEY BALDON GREEN LIMITED WD6
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.88 MW
(Estimated)
Cowley Hill Works Boilerhouse, Albert Street, St Helens, WA10 2RZ (19 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.26 MW
(Estimated)
COWLEY ROAD UXBRIDGE MIDDLESEX UB8 (12 components)

EV charging at residential premises

DSR EV Charging Part of VERDANT BIDCO 2 LIMITED COWLEY BALDON GREEN LIMITED UB8
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.88 MW
(Estimated)
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (3 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Storage (Duration 1h) Part of VERDANT BIDCO 2 LIMITED PIVOTED POWER LLP OX44
Active • 2028-29 (T-4), 2021-22 (T-1)
4.01 MW
(Estimated)
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (9 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.89 MW
(Estimated)
Land at Nineveh Farm, Nuneham Courtenay, Oxford OX44 9PA (2 components)

Lithium-based battery energy storage system

Storage (Duration 2h) Part of VERDANT BIDCO 2 LIMITED COWLEY BALDON GREEN LIMITED OX44
Active • 2025-26 (T-1)
13.57 MW
(Estimated)
Land off Carseview Road, Forfar, DD8 3BS (8 components)
• 3 gas reciprocating engines used for power generation, with associated infrastructure.
• Battery storage and associated infrastructure
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
7.83 MW
(Estimated)
LAND SOUTH WEST OF COWLEY SUBSTATION, NUNEHAM COURTENAY, OXFORD, OX44 9PA (1 component)

Lithium-based battery energy storage system.

Storage (Duration 1.5h) Part of VERDANT BIDCO 2 LIMITED COWLEY BALDON GREEN LIMITED OX44
Active • 2026-27 (T-4)
8.88 MW
(Estimated)
Medway Power Station, Rochester, Medway, ME3 0AG (25 components)
• Medway
• Medway CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
702.50 MW
(Estimated)
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
319.68 MW
(Estimated)
Tyndale House Unit 2/5 134A Cowley Road Oxfordshire Great Britain OX4 1JE (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

DSR Part of VERDANT BIDCO 2 LIMITED COWLEY BALDON GREEN LIMITED OX4
Active • 2025-26 (T-4)
8.88 MW
(Estimated)
Loading map...
Showing 14 locations