Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "LAND TO THE SOUTH OF HAWTHORN PIT SUBSTATION, JADE BUSINESS PARK, MURTON, SR7 9DR"

0 unique locations (0 components)

Fort Parkway, Heartlands, Birmingham, B24 9QT (11 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output

OCGT and Reciprocating Engines Part of Whitetower Holdings UK Limited WHITETOWER ENERGY LIMITED B24
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
16.05 MW
(Estimated)
Greystoke Road, Penrith, Cumbria, CA11 0BX. (4 components)

Energy facility comprising of reciprocating engine sets.

Part of STOR Power Ltd STOR 103 Ltd Not Prequalified CA11
Inactive • 2020-21 (T-4), 2017-18 (T-1)
No capacity data
(De-rated)
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (27 components)
• The CMU MAIN16 consists of three identical components (JENBA1,2 &3), with each CHP engine delivering 1.845MW (1.942MW design output but derated at 95% due to their age). The total CMU generation capacity is declared 4.981MW and additional PSEUDO MPAN's are fitted.
• The CMU MAIN16 consists of three identical components (JENBA1,2 &3), with each CHP engine delivering 1.845MW (1.942MW design output but derated at 95% due to their age). The total CMU generation capacity is declared 5.535MW and additional PSEUDO MPAN's are fitted.
• The CMU component JENBA1 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
• ... and 2 more unique descriptions
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
No capacity data
(De-rated)
Loading map...
Showing 3 locations