Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "ME2"

21 unique locations (166 components)

Sort by: Relevance A-Z Components MW Date
2 Parsonage Lane, Rochester, Kent, ME2 4UR (2 components)

New Gas-fired 20MW CMU connected on the distrbution network boundary via a standard COP2 meter with no auxilliary load on site

Active • 2021-22 (T-4)
No capacity data
(Estimated)
ASDA Store, 108/110 High Street Strood, Kent, ME2 4TR (18 components)

Load curtailment from refridgeration

Active • 2022-23 (T-1), 2023-24 (T-1) ...
18.11 MW (Est from CMU) (part of 18.11 MW aggregated CMU)
(Estimated)
Aylesford BES Site Old Church Road Burham Kent ME20 7PA (4 components)

29MW Battery Storage located at Aylesford.

Active • 2018-19 (T-1), 2021-22 (T-4)
No capacity data
(Estimated)
Aylesford BES Site, Old Church Road, Burham, Kent, ME20 7PA (4 components)

29 MW of demand reduction

Active • 2019-20 (T-1)
No capacity data
(Estimated)
Aylesford BES Site, Old Church Road, Burham, Kent, ME20 7TN (5 components)

29 MW of DSR

Active • 2020-21 (T-1), 2020-21 (T-4)
No capacity data
(Estimated)
Brakes - Aylesford, Unit A, Larkfield Trading Estate, New Hythe Lane, Larkfield, AYLESFORD, Kent, ME20 6SW (23 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2024-25 (T-4), 2025-26 (T-4) ...
21.88 MW (Est from CMU) (part of 21.88 MW aggregated CMU)
(Estimated)
Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB. (18 components)

The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MW. Battery capacity will be reduced to 38.5MWh after 15 …

Active • 2023-24 (T-1), 2023-24 (T-4) ...
51.53 MW (Est from CMU)
(Estimated)
ME2 (32 components)

Domestic EV charge point

Active • 2024-25 (T-1), 2024-25 (T-4) ...
329.60 MW (Est from CMU) (part of 329.60 MW aggregated CMU)
(Estimated)
ME20 (22 components)

Domestic EV charger

Active • 2024-25 (T-1), 2024-25 (T-4) ...
57.48 MW (Est from CMU) (part of 57.48 MW aggregated CMU)
(Estimated)
Rochester Power Generation Plant, Whitewall Road, Medway City Estate, Rochester, Kent, ME2 4DZ (13 components)

Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2023-24 (T-4), 2024-25 (T-1) ...
52.07 MW (Est from CMU)
(Estimated)
Royal Mail Medway, Knight Road, Strood, Rochester, Kent ME2 2JE (6 components)

Standby generation

Active • 2017-18 (T-1), 2020-21 (T-4)
No capacity data
(Estimated)
Unit B2, Whitewall Road, Rochester, ME2 4DZ (1 component)

Diesel and/or gas reciprocating engines.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Whitewall Cottages, Upnor Rd, Upnor, Rochester, ME2 4UZ (5 components)

50 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets

Active • 2017-18 (T-1), 2020-21 (T-4)
No capacity data
(Estimated)
Whitewall Road, Rochester, Kent, ME2 4DZ (5 components)

A series of gas generators on an existing site.

Active • 2023-24 (T-1), 2024-25 (T-1)
75.98 MW (Est from CMU)
(Estimated)
Whitewalls Road, Rochester, Kent, ME2 4DZ (2 components)

A series of gas generators on an existing site.

Active • 2025-26 (T-1)
37.40 MW
(Estimated)
QUEENS DRIVE SURBITON SURREY KT5 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
No capacity data
(Estimated)
The Droveway St. Margaret's Bay ST. MARGARETS BAY DOVER KENT CT15 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
No capacity data
(Estimated)
THE HIGHWAY HAWARDEN DEESIDE CLWYD CH5 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
No capacity data
(Estimated)
Loading map...