Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "OLD BRISTOL ROAD WESTON-SUPER-MARE BS22"

1 unique locations (12 components)

OLD BRISTOL ROAD WESTON-SUPER-MARE BS22 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
No capacity data
(Estimated)
1 Waterfront Avenue, Edinburgh, EH5 1SG (25 components)
• Glenhove Water Pumping Station
• Office site with behind the meter generation
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
0.81 MW (Est from CMU) (part of 0.81 MW aggregated CMU)
(Estimated)
2 Leeds City Office Park, Leeds, West Yorkshire, LS11 5BD (13 components)

Office site with behind the meter back up generation

Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
0.81 MW (Est from CMU) (part of 0.81 MW aggregated CMU)
(Estimated)
4 Callaghan Square, Cardiff, CF10 5BT (12 components)

Office site with behind the meter back up generation

Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
0.81 MW (Est from CMU) (part of 0.81 MW aggregated CMU)
(Estimated)
97 Talbot Road, Stretford, Manchester, Lancashire M16 0TW (12 components)
• A gas fuelled generating station.
• Office site with behind the meter back up generation
Inactive • 2022-23 (T-3), 2020-21 (T-4) ...
0.81 MW (Est from CMU) (part of 0.81 MW aggregated CMU)
(Estimated)
British Gas, Housesteads,Off Stockport Road, Hattersley, SK14 3QU (13 components)

Office site with behind the meter back up generation

Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
0.81 MW (Est from CMU) (part of 0.81 MW aggregated CMU)
(Estimated)
Club Farm, Pimlico Link Road, Clitheroe BB7 1QW (2 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines
• A new power plant, with associated civil works, switchgear and electrical connection.
Inactive • 2022-23 (T-4), 2020-21 (T-4)
No capacity data
(Estimated)
Ferrybridge Power Station, Stranglands Lane, Knottingley, West Yorkshire, WF11 8SQ (125 components)
• Aux. load separately metered
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
• GT8
Active • 2026-27 (T-4), 2025-26 (T-4) ...
31264.81 MW (Est from CMU) (part of 31264.81 MW aggregated CMU)
(Estimated)
John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU (14 components)
• Combined Cycle Gas Turbine
• New 4.5MW CHP at Oxford Hospital
• VIT305 - CHP unit at John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
16.26 MW (Est from CMU) (part of 16.26 MW aggregated CMU)
(Estimated)
Land at Fawley , Northern Access Road, Southampton, SO45 1BD  (7 components)
• CMU Component is 500kVA reciprocating diesel engine.
• Gas Turbine CHP GT001B
• Taylor's Lane OCGT GT Unit 3 Unit fuelled by Gas Oil as specified in BS 2869 Class A2
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Land At Junction With Hunsley Street and Carlisle Road, Sheffield, S4 8DQ (25 components)
• 1,000MW electricity interconnector between GB and Belgian transmission systems. The Nemo Link interconnector will consist of subsea and underground cables connected to a converter station in each country, which will allow electricity to flow in either direction between the two countries. Nemo Link® will build the converter station on an 8 hectare site, formerly occupied by the Richborough Power Station, which now forms part of the Richborough Energy Park proposals. A similar converter station will be built in the industry zone Herdersbrug in Bruges.
• Battery energy storage unit
• Two gas CHP in a horticultural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.52 MW (part of 21.52 MW aggregated CMU)
(Estimated)
Land at Manton Wood, Retford Road, Worksop, Notts, S80 2PU (3 components)

10 gas reciprocating engines used for power generation, with associated infrastructure.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
19.00 MW (Est from CMU) (part of 19.00 MW aggregated CMU)
(Estimated)
Land off Salmon Lane, Annesley, Nottinghamshire NG15 0DF (10 components)
• New reciprocating gensets in acoustic enclosure
• Onsite load reduction and back up generation behind the meter on multiple sites
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
7.44 MW (Est from CMU) (part of 7.44 MW aggregated CMU)
(Estimated)
Land to the west of Old Forge Dr, Redditch B98 7SY, UK (7 components)
• New build gas generator
• The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
No capacity data
(Estimated)
Laporte Road, Stallingborough, North East Lincolnshire, DN40 2PR (76 components)
• 2.8MWe back pressure steam turbine
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
Active • 2025-26 (T-1), 2024-25 (T-1) ...
98.70 MW (Est from CMU) (part of 98.70 MW aggregated CMU)
(Estimated)
Lycome Road, Lye Green, Chesham, Buckinghamshire HP5 3LD (2 components)

A new build Battery Energy Storage System.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
National Distribution Centre, Barnsdale Way, Grove Park, Leicester, Leicestershire, LE19 1SU (12 components)
• 4 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery
• Distribution centre with behind the meter back up generation
Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
0.81 MW (Est from CMU) (part of 0.81 MW aggregated CMU)
(Estimated)
Park Farm Barn, Chichester Rd, Selsey, Chichester PO20 9HP, United Kingdom (58 components)
• A Packaged 3.976MW, 11kV natural gas fired reciprocating engine CHP
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Wind Turbine Generators x 15
Active • 2028-29 (T-4), 2027-28 (T-4) ...
64.94 MW (Est from CMU) (part of 64.94 MW aggregated CMU)
(Estimated)
Tees Valley EfW Lines 1 & 2 Haverton Hill Road Billingham Cleveland TS23 1PY (13 components)

Existing Energy from Waste Plant

Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.89 MW (Est from CMU) (part of 18.89 MW aggregated CMU)
(Estimated)
Vacant land off Middleton Road, Morecambe, Lancashire, LA3 3NT (2 components)

16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Inactive • 2021-22 (T-4)
No capacity data
(Estimated)
Loading map...
Showing 21 locations