Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "PARK DRIVE LEEDS LS12"

1 unique locations (5 components)

PARK DRIVE LEEDS LS12 (5 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
7.01 MW
(Estimated)
Hem Heath, Sir Stanley Matthews Way, Trentham Lakes, Trentham, Stoke on Trent, ST4 8GR (9 components)
• Gas fired reciprocating engine(s)
• Gas reciprocating engines as the generating unit.
Reciprocating engines Part of Alkane Energy Limited ALKANE ENERGY UK LIMITED ST4
Active • 2027-28 (T-4), 2023-24 (T-4) ...
2.02 MW
(Estimated)
Richborough Energy Park Ramsgate Road Sandwich CT13 9NL (5 components)
• 35.000MW battery energy storage system
• 35.000MW battery energy storage system.
• 49.990 MW battery energy storage system at Richborough Energy Park
• ... and 2 more unique descriptions
Storage (Duration 1h) Part of SOSTENEO BESS 1 (UK) LIMITED RICHBOROUGH ENERGY PARK LIMITED CT13
Active • 2026-27 (T-4), 2025-26 (T-1) ...
9.30 MW
(Estimated)
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (32 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
25.21 MW
(Estimated)
West Marsh Road Spalding Lincolnshire PE11 3BB (3 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
• A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Active • 2024-25 (T-4), 2022-23 (T-4) ...
95.14 MW
(Estimated)
Loading map...
Showing 5 locations