Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "PARK DRIVE LEEDS LS12"

1 unique locations (5 components)

PARK DRIVE LEEDS LS12 (5 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
7.01 MW
(Estimated)
Near 10 Granny Barbours Road Nairn IV12 5HX (1 component)

30.000 MW standalone BESS

Storage (Duration 1h) Part of Blackmead Infrastructure Limited BLACKPARK ENERGY STORAGE LIMITED IV12
Active • 2026-27 (T-4)
3.54 MW
(Estimated)
Richborough Energy Park Ramsgate Road Sandwich CT13 9NL (5 components)
• 35.000MW battery energy storage system
• 35.000MW battery energy storage system.
• 49.990 MW battery energy storage system at Richborough Energy Park
• ... and 2 more unique descriptions
Storage (Duration 1h) Part of SOSTENEO BESS 1 (UK) LIMITED RICHBOROUGH ENERGY PARK LIMITED CT13
Active • 2026-27 (T-4), 2025-26 (T-1) ...
9.30 MW
(Estimated)
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (32 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
25.21 MW
(Estimated)
Loading map...
Showing 4 locations