Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "PARK DRIVE LEEDS LS12"

1 unique locations (5 components)

PARK DRIVE LEEDS LS12 (5 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
7.01 MW
(Estimated)
Camela Lane, Camblesforth, North Yorkshire, England, YO8 8HA. (2 components)

New Build Battery Storage

Active • 2028-29 (T-4)
1.57 MW
(Estimated)
Cleve Hill, Seasalter Road, Graveney with Goodnestone, Swale, Kent CT5 4BP (1 component)

A new build 230MW/460MWh battery storage facility connected to the National Grid Transmission network at 132kV, located at Cleve Hill.

Active • 2026-27 (T-4)
53.17 MW
(Estimated)
Common Farm Bookers Lane Dinnington Sheffield S25 1ZX England (1 component)

AC coupled lithium Battery Energy Storage System with associated infrastructure.

Active • 2028-29 (T-4)
6.86 MW
(Estimated)
Common Farm Bookers Lane Dinnington Sheffield S25 1ZX England (1 component)

AC coupled lithium Battery Energy Storage System with associated infrastructure.

Active • 2028-29 (T-4)
6.86 MW
(Estimated)
Lower Langage Farm, Kingsway, Plympton Plymouth PL7 5AW (1 component)

Battery Storage system to be installed at Langage Solar Park

Active • 2027-28 (T-4)
0.57 MW
(Estimated)
Manvers Callflex Business Park South of Doncaster Road Rotherham S63 7EF (8 components)
• Gas generating unit(s)
• Gas reciprocating engines
Reciprocating engines Part of Alkane Energy Limited ALKANE ENERGY UK LIMITED S63
Active • 2028-29 (T-4), 2026-27 (T-4) ...
4.40 MW
(Estimated)
Richborough Energy Park Ramsgate Road Sandwich CT13 9NL (5 components)
• 35.000MW battery energy storage system
• 35.000MW battery energy storage system.
• 49.990 MW battery energy storage system at Richborough Energy Park
• ... and 2 more unique descriptions
Storage (Duration 1h) Part of SOSTENEO BESS 1 (UK) LIMITED RICHBOROUGH ENERGY PARK LIMITED CT13
Active • 2026-27 (T-4), 2025-26 (T-1) ...
9.30 MW
(Estimated)
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1282.60 MW
(Estimated)
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (32 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
25.21 MW
(Estimated)
Loading map...
Showing 10 locations