Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "PO30 3AR"

3 unique locations (53 components)

Sort by: Relevance A-Z Components MW Date
Arreton Valley Nursery, Hale common, Arreton, Isle of Wight, PO30 3AR (10 components)

Industrial flexible demand used for manufacturing processes and remotely controlled via SCADA.

Active • 2024-25 (T-1), 2028-29 (T-4)
10.16 MW (Est from CMU)
(Estimated)
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (32 components)

The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).

Active • 2017-18 (T-1), 2019-20 (T-1) ...
No capacity data
(Estimated)
Wight Salads Arreton Newport Isle of Wight PO30 3AR (11 components)

The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be the technology used

Active • 2022-23 (T-1), 2022-23 (T-3) ...
5.48 MW (Est from CMU)
(Estimated)
Loading map...