Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "SK17 7JB"

5 unique locations (29 components)

Sort by: Relevance A-Z Components MW Date
Land at STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (2 components)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16MW, located in Buxton.

Active • 2025-26 (T-1)
19.73 MW (Est from CMU)
(Estimated)
Land At STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16 MW, located in Buxton.

Active • 2024-25 (T-1)
3.46 MW
(Estimated)
STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (4 components)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 14MW, located in Buxton

Active • 2024-25 (T-1), 2025-26 (T-1)
38.34 MW (Est from CMU)
(Estimated)
Waterswallows Road Buxton Derbyshire SK17 7JB (21 components)

2.115mw diesel and/or gas dual fuel reciprocating engine

Active • 2018-19 (T-1)
No capacity data
(Estimated)
Waterswallows Road, Buxton, Derbyshire, SK17 7JB (1 component)

Energy facility comprising of reciprocating engine sets.

Inactive • 2021-22 (T-4)
No capacity data
(Estimated)
Loading map...