Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "TR2"

17 unique locations (89 components)

Sort by: Relevance A-Z Components MW Date
Arundel Park, Connor Downs, Hayle, TR27 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
0.0049 MW (Est from CMU)
(De-rated)
Asda Hayle Harbour, Off South Quay Consew Road TR27 4EP (8 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
No capacity data
(De-rated)
BY FIVE CLODGY VIEW ST. IVES CORNWALL TR26 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
0.02 MW
(De-rated)
Chenhalls Road St Erth Hale Cornwall TR27 6LA (5 components)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(De-rated)
Collygree Parc, Goldsithney, Penzance, Cornwall, TR20 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
No capacity data
(De-rated)
Elm Grove, Connor Downs, Hayle, TR27 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Inactive • 2025-26 (T-1)
No capacity data
(De-rated)
FUGGOE LANE CARBIS BAY ST. IVES CORNWALL TR26 (1 component)

EV charging at residential premises

Inactive • 2027-28 (T-4)
0.02 MW
(De-rated)
Germoe, Penzance, TR20 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Inactive • 2025-26 (T-1)
No capacity data
(De-rated)
Hall Trenwith Lane ST. IVES CORNWALL TR26 (1 component)

EV charging at residential premises

Inactive • 2027-28 (T-4)
0.02 MW
(De-rated)
TR2 (29 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.08 MW
(De-rated)
TR26 (16 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.0050 MW
(De-rated)
TR27 (10 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.0050 MW
(De-rated)
Unit 1 Guildford Road Industrial Estate Hayle TR27 4QZ (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
(De-rated)
Veryan Green, Truro, Cornwall, TR2 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Inactive • 2025-26 (T-1)
No capacity data
(De-rated)
Loading map...
Showing 14 locations