Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "TS21 1EA"

6 unique locations (32 components)

Sort by: Relevance A-Z Components MW Date
Carlton, Stockton-on-Tees, TS21 1EA (7 components)

1.200MW of battery storage located at Stockton-on-Tees.

Inactive • 2020-21 (T-1), 2022-23 (T-3) ...
4.65 MW (Est from CMU) (part of 4.65 MW aggregated CMU)
(Estimated)
Carlton, Stockton-on-Tees, TS21 1EA (5 components)

Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 …

Active • 2026-27 (T-4), 2027-28 (T-4) ...
0.26 MW (part of 0.26 MW aggregated CMU)
(Estimated)
Carlton,Stockton-On-Tees,TS21 1EA (8 components)

1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Carlton,Stockton-On-Tees,TS21 1EA

Inactive • 2017-18 (T-1), 2020-21 (T-4)
No capacity data
(Estimated)
Land South East of the Carrs Fishing Lakes, Letch Lane, Carlton, Stockton-on-Tees, TS21 1EA (1 component)

CMU is a 57MW/114MWh Battery Electric Storage System, which will connect to the Transmission network via a tertiary winding at the Norton 275kV substation. The Facility will comprise of 32 …

Active • 2027-28 (T-4)
5.76 MW
(Estimated)
Solar Farm High Meadow Farm Carlton Village Carlton Stockton-on-Tees Durham TS21 1EA (5 components)

Demand reduction

Inactive • 2018-19 (T-1), 2021-22 (T-4)
No capacity data
(Estimated)
SOLAR FARM HIGH MEADOW FARM CARLTON VILLAGE CARLTON STOCKTON-ON-TEES DURHAM TS21 1EA (6 components)

Battery with a de-rated capacity of 1.043MW

Inactive • 2017-18 (T-1)
No capacity data
(Estimated)
Loading map...